Breaking law of overburden rock and key mining technology for narrow coal pillar working face in isolated island

Du Feng1,2,3, Li Zhenhua4,5,6, Li Songtao1

  • 1School of Energy Science and Engineering, Henan Polytechnic University, Jiaozuo, 454000, Henan, China.

Scientific Reports
|June 6, 2024
PubMed

Related Concept Videos

Quarrying of Stone01:15

Quarrying of Stone

Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
109
Brick Cutting Techniques01:08

Brick Cutting Techniques

Brick-cutting techniques involve various tools and methods to shape bricks for construction. A mason's hammer with a chisel-pointed end is used for basic shaping through sharp, precise strikes. For more complex shapes requiring higher precision, a power saw with a water-cooled diamond blade is used.
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of...
139
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
61
Wedges01:24

Wedges

A wedge is a simple machine that serves various purposes, such as adjusting the elevation of structural or mechanical parts, providing stability for heavy objects, and splitting a body into two parts. This versatile tool can amplify an applied force, making it easier to manipulate large or heavy objects.
Consider using a wedge to lift a heavy slab. Here, the wedge functions by converting the applied force into a much larger force directed almost perpendicular to the initial force. This...
1.1K
Placing Concrete01:17

Placing Concrete

The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
92
Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...