Mitigating Measurement Inaccuracies in Digital Twins of Construction Machinery through Multi-Objective Optimization

Misganaw Abebe1, Yonggeun Cho2, Seung Chul Han2

  • 1Department of Mechanical Engineering, Kunsan National University, Gunsan 54150, Republic of Korea.

PubMed

Related Concept Videos

Common Leveling Mistakes and Errors01:17

Common Leveling Mistakes and Errors

A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
71
Distance Corrections01:15

Distance Corrections

To achieve precise distance measurements, especially in surveying and construction, certain corrections must be applied to account for potential sources of error like the standardization errors, temperature variations, and slope adjustments.Standardization error emerges when measurement equipment undergoes changes, such as wear, repairs, or weather impacts. To address this, surveyors compare the equipment’s readings to a standard. This process identifies any deviation that might lead to...
27
Design Example: Measuring Distance Between Two Points with Obstructions01:10

Design Example: Measuring Distance Between Two Points with Obstructions

When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
32
Modeling and Similitude01:12

Modeling and Similitude

Scaled modeling is a fundamental technique in engineering, enabling the study of large and complex systems by creating smaller, manageable replicas that recreate critical characteristics of the original. In hydrology and civil infrastructure, for example, scaled models of dams help analyze water flow, turbulence, and pressure. This method allows for accurate predictions of real-world behavior within a controlled environment, significantly reducing the cost and time involved in full-scale...
261
Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device01:30

Design Example: Identifying the Locations of Monuments in the Field Using Global Positioning System Device

Surveyors use Global Positioning System (GPS) technology to measure the precise location and elevation of points on Earth. In a recent survey, GPS receivers were used to determine the coordinates and elevations of two park monuments. The process involved careful mission planning, data collection, and correction to ensure accuracy. The survey began with mission planning to identify optimal satellite visibility and minimize Position Dilution of Precision (PDOP). A geodetic control point...
27
Electronic Distance Measuring Instruments01:30

Electronic Distance Measuring Instruments

Electronic Distance Measuring Instruments (EDMs) are essential tools in modern surveying, offering precise distance measurements by emitting electromagnetic signals and calculating the time required for these signals to travel to a target and return. Two primary types of signals are used in EDMs — light waves and microwaves — each suited to specific environmental and distance requirements. Light-wave-based EDMs utilize either infrared or laser light, providing high accuracy over short...
32