Identification of Shield Tunnel Segment Joint Opening Based on Annular Seam Pressure Monitoring
Hongbin Xu1,2, Qucheng Liu1,2, Bingtian Li3
1College of Civil and Transportation Engineering, Institute of Urban Smart Transportation & Safety Maintenance, Shenzhen University, Shenzhen 518060, China.
Abstract:
Tunnels for subways and railways are a vital part of urban transportation systems, where shield tunneling using assembled segmental linings is the predominant construction approach. With increasing operation time and varying geological conditions, shield tunnels usually develop defects that compromise both structural integrity and operational safety. One common issue is the separation of segment joints that may cause water/mud penetration and corrosion. Existing inspection strategies can only detect openings after their occurrence, which cannot provide early warnings for predictive maintenance. To address this issue, this work proposes a multi-point seam contact pressure monitoring method for joint opening identification. It first derived the theoretical correlation between contact pressure distribution and segment opening; then, a finite element model was established to explore the stress and deformation responses under combined axial and bending loads. Finally, multi-point piezoelectric film sensors were implemented on a scaled segment model to validate the theoretical and numerical analyses. Results indicate that the multi-point monitoring method can effectively identify opening amounts at the segment joints with an average error of 8.8%, confirming the method's feasibility. These findings support the use of this monitoring technique for early detection and assessment of joint openings in shield tunnels.
Related Concept Videos
Thin-Walled Hollow Shafts
Types of Building Separation Joints
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
Stress Concentrations in Circular Shafts
Unsymmetric Loading of Thin-Walled Members: Problem Solving
To compute the shear forces, find the shear flow at a specific distance from the endpoint using the vertical shear and the moment of inertia values. The total shear force on the flange is calculated by integrating the shear flow from one end of the flange to the other.
Next, calculate the moments of...
Deformation in a Circular Shaft
Design of Transmission Shafts - Stress Analysis