Related Experiment Video
Updated: Jun 21, 2025

A Uniaxial Compression Experiment with CO2-Bearing Coal Using a Visualized and Constant-Volume Gas-Solid Coupling Test System
Published on: June 12, 2019
Preferential evaluation of coal filling mining scheme under building pressure based on improved grey target
Junpeng Ma1,2, Chaoqun Ma3, Tao Liu4
1College of Energy and Mining Engineering, Shandong University of Science and Technology, Qingdao, 266590, People's Republic of China.
Abstract:
The problem of coal compression under buildings is common in underground mining of coal mines in China. The selection of traditional mining programme is subjective and lacks scientific rationality. In order to solve this problem, this paper studies the evaluation index system and model applicable to the selection of coal filling mining scheme under buildings. A multi-objective evaluation index system integrating economic, technical and adaptive factors is constructed. And an integrated optimization model is established, which is based on the traditional grey target model, combining the game theory optimal combination of weights with the hierarchical analysis method, entropy weight method, Critic method to determine the weights, and then introducing the TOPSIS model and the Mars distance to establish an improved grey target decision-making model. The validity of the evaluation index system and model is verified by taking the example of coal mining under pressure of buildings in five mining areas of a coal mine, which provides technical support for decision makers. This study helps to scientifically and reasonably carry out the preferred mining scheme of coal filling under building pressure.
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Design Example: Aggregate Gradation
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
Compacting Factor test
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
Design Example: Managing Concrete Workability