Estimating the Workability of Concrete with a Stereovision Camera during Mixing

Teemu Ojala1, Jouni Punkki1

  • 1Department of Civil Engineering, School of Engineering, Aalto University, 02150 Espoo, Finland.

PubMed

Related Concept Videos

Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
77
Mixing Concrete01:30

Mixing Concrete

Concrete mixing ensures a homogenous blend where aggregates are well-coated with cement paste. Concrete mixing is typically done using two main types of mixers: batch and continuous. Batch mixers handle one batch at a time, thoroughly combining materials before discharging and receiving the next batch. In contrast, continuous mixers receive a steady flow of ingredients, mixing them consistently and discharging without interruption. Within batch mixers, tilting drum mixers mix with internal...
109
Vebe Test01:22

Vebe Test

The Vebe test is a method used to measure the workability of concrete, particularly effective for dry concrete mixes. This test employs a specific apparatus that includes a cylindrical chamber, a standard slump cone, and a transparent disc-shaped rider, all mounted on a vibrating table. The cylindrical chamber has dimensions of nine and a half inches in diameter and eight inches in height.
To conduct the test, concrete is placed into the slump cone. The concrete is filled in layers and...
131
Mixing Time01:19

Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
155
Slump Test01:20

Slump Test

The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
199
Workability of Concrete01:25

Workability of Concrete

The workability of concrete is a crucial property that affects its handling, placing, and finishing during construction. It describes the ease with which concrete can be mixed, placed, compacted, and finished. Workability is primarily concerned with the concrete's movement and its ability to resist internal friction and external resistance from molds and reinforcements during the application process.
Concrete's workability is determined by its resistance to internal forces that arise...
101