STEP-organizing a major project to tackle significant uncertainty

P Methven1

  • 1UK Industrial Fusion Solutions Ltd., UK Atomic Energy Authority, Culham Campus, Abingdon, Oxon OX14 3DB, UK.

Summary

The Spherical Tokamak for Energy Production (STEP) program uses an adaptive organization design to manage uncertainty and exploit opportunities in fusion energy development. This approach emphasizes collaboration and guided empowerment for successful project delivery.

Related Concept Videos

Uncertainty: Overview00:59

Uncertainty: Overview

In analytical chemistry, we often perform repetitive measurements to detect and minimize inaccuracies caused by both determinate and indeterminate errors. Despite the cares we take, the presence of random errors means that repeated measurements almost never have exactly the same magnitude. The collective difference between these measurements - observed values - and the estimated or expected value is called uncertainty. Uncertainty is conventionally written after the estimated or expected value.
529
Propagation of Uncertainty from Random Error00:59

Propagation of Uncertainty from Random Error

An experiment often consists of more than a single step. In this case, measurements at each step give rise to uncertainty. Because the measurements occur in successive steps, the uncertainty in one step necessarily contributes to that in the subsequent step. As we perform statistical analysis on these types of experiments, we must learn to account for the propagation of uncertainty from one step to the next. The propagation of uncertainty depends on the type of arithmetic operation performed on...
657
Propagation of Uncertainty from Systematic Error01:10

Propagation of Uncertainty from Systematic Error

The atomic mass of an element varies due to the relative ratio of its isotopes. A sample's relative proportion of oxygen isotopes influences its average atomic mass. For instance, if we were to measure the atomic mass of oxygen from a sample, the mass would be a weighted average of the isotopic masses of oxygen in that sample. Since a single sample is not likely to perfectly reflect the true atomic mass of oxygen for all the molecules of oxygen on Earth, the mass we obtain from this...
490
Uncertainty: Confidence Intervals00:54

Uncertainty: Confidence Intervals

The confidence interval is the range of values around the mean that contains the true mean. It is expressed as a probability percentage. The interpretation of a 95% confidence interval, for instance, is that the statistician is 95% confident that the true mean falls within the interval. The upper and lower limits of this range are known as confidence limits. The confidence limits for the true mean are estimated from the sample's mean, the standard deviation, and the statistical factor...
3.1K
Strategies for Assessing and Addressing Confounding01:25

Strategies for Assessing and Addressing Confounding

Confounding is a critical issue in epidemiological studies, often leading to misleading conclusions about associations between exposures and outcomes. It occurs when the relationship between the exposure and the outcome is mixed with the effects of other factors that influence the outcome. Given that, addressing confounding is of high importance for drawing accurate inferences in research.
Confounding can be addressed at both the design phase of a study and through analytical methods after data...
87
Significant Figures in Calculations00:58

Significant Figures in Calculations

Uncertainty in measurements can be avoided by reporting the results of a calculation with the correct number of significant figures. This can be determined by the following rules for rounding numbers:
10.4K