Zhu Haoyu1, Lai Xingping2,3, Qiao Hao2
1College of Energy Engineering, Xi'an University of Science and Technology, Xi'an, 710054, China. 22203077040@stu.xust.edu.cn.
Abstract:
Based on the background of ZF2822 island working face in Xiagou Coal Mine, the characteristics of overburden fracture structure and surrounding rock control technology of island working face are explored by means of theoretical analysis, numerical simulation and field measurement. The results show that the ten morphological structures of the main roof fracture can be divided into four typical symmetrical structures and six asymmetric structures. According to the stress calculation formula of the key block B to the coal pillar, the stress characteristics of the 10 structures are classified and the risk classification is carried out. Four typical structures (a), (b), (c) and (d) were constructed to simulate the stress and strain characteristics of surrounding rock. The overlying strata subsidence displacement values of (a), (b), (c) and (d) at the roadway are 1.75 m, 1.5 m, 0.8 m and 0.6 m respectively, and the maximum stresses are 26.6 MPa, 19.5 MPa, 15.5 MPa and 10.0 MPa respectively, (a) > (b) > (c) > (d). Therefore, the surrounding rock control technology of gob-side roadway in island working face is put forward, the fracture structure of basic roof is determined and the reasonable applicable type of gob-side roadway is selected. The results after pressure relief show that the average daily microseismic energy of ZF2822 working face after pressure relief is 0.87 × 104 J, which is about 42.38% lower than that of April. The average stress is 1.13 MPa lower than that of the mining before the pressure relief area, and the decrease is 22.42%. It shows that the pressure relief has played a very good effect and provides a reference for the same type of mine.
More Related Videos
Related Concept Videos
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Design Consideration
The factor of safety is another key...
Applications of Stress
The...
Design Example: Maintaining Level of an Embankment
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Stress Concentrations