Study on overburden rock structure characteristics and surrounding rock control technology of island working face

Zhu Haoyu1, Lai Xingping2,3, Qiao Hao2

  • 1College of Energy Engineering, Xi'an University of Science and Technology, Xi'an, 710054, China. 22203077040@stu.xust.edu.cn.

Scientific Reports
|September 3, 2024
PubMed

Related Concept Videos

Quarrying of Stone01:15

Quarrying of Stone

Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
105
Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
182
Applications of Stress01:04

Applications of Stress

Consider a structure made of a boom and a rod designed to support a load. These two components are connected by a pin and stabilized by brackets and pins. The boom and the rod are detached from their supports to assess the different stresses imposed on this structure, and a free-body diagram is drawn. Then, all the forces applied, including the load acting on the structure, are identified. The reaction forces exerted on both the boom and the rod are computed using the equilibrium equations.
The...
251
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
56
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
41
Stress Concentrations01:24

Stress Concentrations

Stress concentration is when stress intensifies near discontinuities such as holes or abrupt cross-sectional changes in a structural member. This localized stress can often surpass the average stress within the member. The stress distribution in flat bars, either with a circular hole or varying widths connected by fillets, can be determined experimentally using a photoelastic method. The results are based on ratios of geometric parameters like the ratio of the hole's radius to the smaller...
274