Related Experiment Video
Updated: Jun 11, 2025

A Uniaxial Compression Experiment with CO2-Bearing Coal Using a Visualized and Constant-Volume Gas-Solid Coupling Test System
Published on: June 12, 2019
Optimization of small coal pillar width and control measures in gob-side entry excavation of thick coal seams
Yan-Ping Xue1,2
1China Coal Technology and Engineering Group Shenyang Research Institute, Fushun, 113122, China. 527826949@qq.com.
Abstract:
This study introduces an innovative optimized bolting support system specifically tailored for gob-side entry excavation in thick coal seams at a coal mine in southwestern Shandong, China. Employing theoretical analysis, numerical simulation, and field measurements, the research focuses on examining the failure characteristics of surrounding rock during gob-side entry excavation. The key innovation lies in the development of a 5-meter optimal coal pillar width, ensuring balanced stress distribution and structural integrity. Additionally, a lag time of at least 46 days between gob-side entry excavation and the upper working face retreat is recommended to mitigate roof subsidence and surrounding rock deformation. The optimized bolting support system, featuring increased bolt pretension, utilization of high-strength steel strips, and reinforcement of weak points, effectively reduces deformation of the roadway surrounding rock, meeting support requirements for normal production. This novel approach successfully addresses the support challenges in thick coal seam gob-side entry excavation, enhancing mining safety and resource recovery rates.
Related Concept Videos
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Masonry Cavity Walls
Maintaining a clean cavity during construction...
Thermal Insulation in Masonry Walls
External insulation can be applied using an Exterior Insulation and Finish System (EIFS), which involves affixing panels of plastic foam to the wall and covering them with a polymeric stucco reinforced with glass fiber mesh....
Design Example: Managing Concrete Workability
Design Example: Dimensioning of Concrete Masonry Construction
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
Wedges
Consider using a wedge to lift a heavy slab. Here, the wedge functions by converting the applied force into a much larger force directed almost perpendicular to the initial force. This...