Related Experiment Video
Updated: Jun 7, 2025

Free Radicals in Chemical Biology: from Chemical Behavior to Biomarker Development
Published on: April 15, 2013
Unveiling the Critical Pathways of Hydroxyl Radical Formation in Breakpoint Chlorination: The Role of Trichloramine
Yi-Hsueh Chuang1, Chia-Shun Chou1, Yi-Lin Chu1
1Institute of Environmental Engineering, National Yang Ming Chiao Tung University, Hsinchu city 30010, Taiwan.
Abstract:
Chlorination of ammonia or chloramine-containing waters induces breakpoint chlorination reactions, producing a hydroxyl radical (•OH), but enhances the formation of undesirable N-nitrosamines. The prevailing view attributes •OH formation to a nitrosyl intermediate derived from the hydrolysis of dichloramine, but this pathway is unlikely at neutral or acidic pH. This study reveals a novel mechanism where •OH is generated via interactions between trichloramine (NCl3) and dichloramine (NHCl2), which also form nitrosation agents. Our experiments demonstrated that the NCl3-NHCl2 interaction degrades micropollutants with kinetics 2-3 times faster than breakpoint chlorination. Using electron paramagnetic resonance, we detected •OH in the NCl3-NHCl2 reaction. Micropollutant removal was unimpaired under low dissolved oxygen (O2(aq)) conditions, aligning with negligible O2(aq) changes during the NCl3-NHCl2 reaction and suggesting O2(aq) does not participate in •OH formation. Using benzene as a probe in 18O-labeled H2O, we confirmed water contributes to the oxygen source of •OH in NCl3-NHCl2 interactions, through which parallel reactions occur, leading to the formation of one mole of •OH alongside 1.92 mol of N2. A kinetic model developed in this study accurately predicted •OH and N2 and demonstrated the NCl3-NHCl2 interaction as the primary pathway for •OH formation in breakpoint chlorination, providing new insights into breakpoint chemistry.
More Related Videos
Related Concept Videos
Radical Substitution: Allylic Chlorination
Radical Formation: Homolysis
Radical Substitution: Halogenation of Alkanes and Alkyl Substituents
In the initiation step of the reaction, the chlorine molecule undergoes homolytic cleavage in the presence of light or heat, forming two highly reactive chlorine radicals. Propagation occurs in two...
Radical Substitution: Hydrogenolysis of Alkyl Halides with Tributyltin Hydride
The bonds formed in this reaction are stronger than the bonds broken, making it energetically favorable. The reaction follows a radical chain mechanism similar to radical halogenation...
Radical Anti-Markovnikov Addition to Alkenes: Mechanism
The mechanism starts with chain initiation, which involves two steps. In the first chain initiation step, a weak peroxide bond is homolytically cleaved upon mild heating to form two alkoxy radicals. In the second initiation step, a hydrogen atom is abstracted by the alkoxy...
Formation of Halohydrin from Alkenes

