A Comparison Between Single-Stage and Two-Stage 3D Tracking Algorithms for Greenhouse Robotics

David Rapado-Rincon1, Akshay K Burusa1, Eldert J van Henten1

  • 1Agricultural Biosystems Engineering, Wageningen University and Research, 6708 PB Wageningen, The Netherlands.

PubMed
Summary

Single-stage 3D multi-object tracking (MOT) algorithms outperform two-stage methods for robotic automation in agriculture. This is especially true for complex scenarios with occluded objects, improving tracking accuracy in greenhouses.

Related Concept Videos

One-Degree-of-Freedom System01:24

One-Degree-of-Freedom System

In mechanical engineering, one-degree-of-freedom systems form the basis of a wide range of electrical and mechanical components. Using these models, engineers can predict the behavior of various parts in a larger system, which gives them insight into how different forces interact with each other.
A one-degree-of-freedom system is defined by an independent variable that determines its state and behavior. One example of a one-degree-of-freedom system is a simple harmonic oscillator, such as a...
Relative Motion Analysis using Rotating Axes01:25

Relative Motion Analysis using Rotating Axes

Consider a component AB undergoing a linear motion. Along with a linear motion, point B also rotates around point A. To comprehend this complex movement, position vectors for both points A and B are established using a stationary reference frame.
However, to express the relative position of point B relative to point A, an additional frame of reference, denoted as x'y', is necessary. This additional frame not only translates but also rotates relative to the fixed frame, making it instrumental in...
Relative Motion Analysis using Rotating Axes-Problem Solving01:29

Relative Motion Analysis using Rotating Axes-Problem Solving

Consider a crane whose telescopic boom rotates with an angular velocity of 0.04 rad/s and angular acceleration of 0.02 rad/s2. Along with the rotation, the boom also extends linearly with a uniform speed of 5 m/s. The extension of the boom is measured at point D, which is measured with respect to the fixed point C on the other end of the boom. For the given instant, the distance between points C and D is 60 meters.
Here, in order to determine the magnitude of velocity and acceleration for point...