Determination of production capacity for open-pit coal mines under uncertainty: A model based on economies of scale

Shuai Wang1, Bo Cao1, Runcai Bai1

  • 1College of Mining, Liaoning Technical University, Fuxin, Liaoning Province, People's Republic of China.

Plos One
|January 9, 2025
PubMed

Related Concept Videos

Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
40
Design Example: Aggregate Gradation01:24

Design Example: Aggregate Gradation

The right type and quality of aggregates are crucial for concrete as they significantly influence its properties, mix proportions, and cost-effectiveness. If different sources are available for sand, the commonly used fine aggregate in concrete, the selection of sand is primarily based on its gradation.
The grading, or particle-size distribution, of sand is determined using sieve analysis, with standard sizes ranging from 150 μm to 10 mm (ASTM No. 100 sieve to 3⁄8 in. sieve). Sand is...
90
Estimating Population Mean with Known Standard Deviation01:16

Estimating Population Mean with Known Standard Deviation

To construct a confidence interval for a single unknown population mean μ, where the population standard deviation is known, we need sample mean as an estimate for μ and we need the margin of error. Here, the margin of error (EBM) is called the error bound for a population mean (abbreviated EBM). The sample mean is the point estimate of the unknown population mean μ.
The confidence interval estimate will have the form as follows:
(point estimate - error bound, point estimate +...
8.3K
Uncertainty: Overview00:59

Uncertainty: Overview

In analytical chemistry, we often perform repetitive measurements to detect and minimize inaccuracies caused by both determinate and indeterminate errors. Despite the cares we take, the presence of random errors means that repeated measurements almost never have exactly the same magnitude. The collective difference between these measurements - observed values - and the estimated or expected value is called uncertainty. Uncertainty is conventionally written after the estimated or expected value.
511
Determination of Expected Frequency01:08

Determination of Expected Frequency

Suppose one wants to test independence between the two variables of a contingency table. The values in the table constitute the observed frequencies of the dataset. But how does one determine the expected frequency of the dataset? One of the important assumptions is that the two variables are independent, which means the variables do not influence each other. For independent variables, the statistical probability of any event involving both variables is calculated by multiplying the individual...
2.1K
Propagation of Uncertainty from Random Error00:59

Propagation of Uncertainty from Random Error

An experiment often consists of more than a single step. In this case, measurements at each step give rise to uncertainty. Because the measurements occur in successive steps, the uncertainty in one step necessarily contributes to that in the subsequent step. As we perform statistical analysis on these types of experiments, we must learn to account for the propagation of uncertainty from one step to the next. The propagation of uncertainty depends on the type of arithmetic operation performed on...
639