FSW Optimization: Prediction Using Polynomial Regression and Optimization with Hill-Climbing Method

Piotr Myśliwiec1, Paulina Szawara2, Andrzej Kubit3

  • 1Department of Materials Forming and Processing, Rzeszow University of Technology, al. Powst. Warszawy 8, 35-959 Rzeszów, Poland.

PubMed

Related Concept Videos

Residuals and Least-Squares Property01:11

Residuals and Least-Squares Property

The vertical distance between the actual value of y and the estimated value of y. In other words, it measures the vertical distance between the actual data point and the predicted point on the line
If the observed data point lies above the line, the residual is positive, and the line underestimates the actual data value for y. If the observed data point lies below the line, the residual is negative, and the line overestimates the actual data value for y.
The process of fitting the best-fit...
7.3K
Prediction Intervals01:03

Prediction Intervals

The interval estimate of any variable is known as the prediction interval. It helps decide if a point estimate is dependable.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y. 
2.2K
Survival Tree01:19

Survival Tree

Survival trees are a non-parametric method used in survival analysis to model the relationship between a set of covariates and the time until an event of interest occurs, often referred to as the "time-to-event" or "survival time." This method is particularly useful when dealing with censored data, where the event has not occurred for some individuals by the end of the study period, or when the exact time of the event is unknown.
 Building a Survival Tree
Constructing a...
55
End Point Prediction: Gran Plot01:07

End Point Prediction: Gran Plot

A Gran plot is used to predict the equivalence volume or endpoint of a potentiometric or acid-base titration without reaching the endpoint. Typically, titration data is collected as a function of the titrant's volume up to a point less than the equivalence volume and then transformed into a linear format. The straight line is extended to the x-axis, indicating the necessary titrant volume to achieve the equivalence point.
For potentiometric titration, the Gran plot is created by plotting...
265
Statically Indeterminate Problem Solving01:16

Statically Indeterminate Problem Solving

Statically indeterminate problems are those where statics alone can not determine the internal forces or reactions. Consider a structure comprising two cylindrical rods made of steel and brass. These rods are joined at point B and restrained by rigid supports at points A and C. Now, the reactions at points A and C and the deflection at point B are to be determined. This rod structure is classified as statically indeterminate as the structure has more supports than are necessary for maintaining...
356
Regression Toward the Mean01:52

Regression Toward the Mean

Regression toward the mean (“RTM”) is a phenomenon in which extremely high or low values—for example, and individual’s blood pressure at a particular moment—appear closer to a group’s average upon remeasuring. Although this statistical peculiarity is the result of random error and chance, it has been problematic across various medical, scientific, financial and psychological applications. In particular, RTM, if not taken into account, can interfere when...
6.3K