Germination time: impact on nutritional, thermal, and paste properties of red rice
Thauana Heberle1, Lucas Ávila do Nascimento1, Ya-Jane Wang2
1Department of Agroindustrial Science and Technology, Federal University of Pelotas, Pelotas, Brazil.
Background:
The study investigates how varying germination times affect the nutritional, thermal, and pasting properties of red rice. Germination was conducted over 32 h, with aliquots collected every 2 h starting from 18 h for property evaluation.
Results:
At all evaluated germination times, the red rice samples exhibited low to intermediate amylose levels, while resistant starch content remained relatively constant (approximately 15-20%). Structural changes in the starch were observed: the peak viscosity decreased, maximum gelatinization of the granules occurred at 76 °C, and spectroscopic bands characteristic of this polysaccharide were detected at 3400 cm-1 (OH stretching) and within the 1150-1000 cm-1 range (COH and COC stretching). Protein and fiber content remained unchanged throughout the process, whereas carbohydrate content varied by 10 g kg-1. Protein digestibility increased after 26 h and continued to rise until the end of germination, while starch digestibility decreased throughout the process, particularly between 24 and 26 h.
Conclusion:
The thermal properties of the grains remained unchanged, as did the starch digestibility, suggesting the potential application of this flour in gluten-free bakery products. © 2025 Society of Chemical Industry.
More Related Videos
09:43Author Spotlight: Streamlining Rice Breeding with CRISPR/Cas for Obtaining Optimal Phenotypic and Agronomic Traits
Published on: January 3, 2025
05:55High-throughput, Microscale Protocol for the Analysis of Processing Parameters and Nutritional Qualities in Maize Zea mays L.
Published on: June 16, 2018
