Related Experiment Video
Updated: May 5, 2026

Measuring Carbon-based Contaminant Mineralization Using Combined CO2 Flux and Radiocarbon Analyses
Published on: October 21, 2016
Study on CCS source-sink matching and its cluster deployment in multi-type geological bodies in Anhui Province of
Huihuang Fang1,2,3, Chengchuan Gu4,5, Kang Ye4,5
1School of Earth and Environment, Anhui University of Science and Technology, Huainan, 232001, Anhui, China. huihuangfang@aust.edu.cn.
Abstract:
Scientific and reasonable source-sink matching is an important basis for the site selection of CCUS (i.e., Carbon capture, utilization and storage) cluster deployment project. In this study, deep saltwater layer, depleted oil and gas reservoir and unrecoverable coal field in Anhui province are the research objects. Firstly, the evaluation methods of CO2 storage potential of multi-type geological bodies are discussed, respectively. Secondly, the methods of source-sink matching of CCS and its pipe network optimization are discussed. Then the application schemes of CCS source-sink matching and its cluster deployment are established. The results show that the cumulative CO2 emissions of 27 active coal-fired power plants in Anhui province are nearly one trillion tons during the 30-year planning period. The geological storage potential of CO2 is 899.08 × 108 t, and the deep saltwater layer has absolute storage advantage. After the optimization, the total amount of CO2 stored in saltwater layer is 9198.72 million tons, and the cumulative planning pipeline is 684.37 km, which requires a cumulative capital of 5.20*1011 $, and pipeline planning and accumulated capital can save 67.19% of pipeline length and 26.01% of total capital, respectively. The CCS cluster deployment in Anhui province can focus on Huaibei coalfield, Huainan coalfield, Hefei metropolitan area, and Yangtze River Economic Belt, and should give full play to the advantages of saltwater layer layout. Demonstration projects should be built in clusters to simplify the overall layout of CCS pipe network. Connecting C23 and C25, C27 and C10, and C18 and C13 can connect the four CCS cluster deployment areas in Anhui province into a whole. This study can provide theoretical support for the cluster deployment and demonstration project implementation of CCS in Anhui province.
More Related Videos
Related Concept Videos
Cluster Sampling Method
To choose a cluster sample, divide the population into clusters (groups) and then randomly select some of the clusters. All the members from these clusters are in the cluster sample. For example, if you randomly sample four departments from your...
Sampling Plans
Random sampling is a method where each member of the population has an equal chance of being selected for the sample. It involves selecting individuals randomly, often using random number generators or lottery-type methods. For example, when analyzing the properties of a...

