Trajectory prediction via proposal guided transformer with out way attention

Wei Xu1, Ruochen Li1, Xiaodong Du1

  • 1College of Transportation, Shandong University of Science and Technology, Qingdao, 266590, China.

Scientific Reports
|April 18, 2025
PubMed

Related Concept Videos

Types Of Transformers01:16

Types Of Transformers

Transformers can provide desired voltages to a circuit by modifying the number of turns in the secondary windings.
If the ratio of the number of turns in the secondary winding to that of the primary winding is greater than one, then the transformer is said to be a step-up transformer. In a step-up transformer, the voltage at the secondary winding is greater than the voltage applied at the primary winding.
However, if this ratio is less than one, the transformer is said to be a step-down...
End Point Prediction: Gran Plot01:07

End Point Prediction: Gran Plot

A Gran plot is used to predict the equivalence volume or endpoint of a potentiometric or acid-base titration without reaching the endpoint. Typically, titration data is collected as a function of the titrant's volume up to a point less than the equivalence volume and then transformed into a linear format. The straight line is extended to the x-axis, indicating the necessary titrant volume to achieve the equivalence point.
For potentiometric titration, the Gran plot is created by plotting the...
Transformers with Off-Nominal Turns Ratios01:25

Transformers with Off-Nominal Turns Ratios

In scenarios involving parallel transformers with disparate ratings, developing per-unit models requires accommodating off-nominal turns ratios. This situation arises when the selected base voltages are not proportional to the transformer’s voltage ratings. Consider a transformer where the rated voltages are related by the term a. If the chosen voltage bases satisfy a relationship involving term b, term c is defined as the ratio of these bases. This ratio is then substituted into the rated...