Related Experiment Video
Updated: Jul 6, 2026

Continuous Instream Monitoring of Nutrients and Sediment in Agricultural Watersheds
Published on: September 26, 2017
Inclusion of fly ash effects in ADM1: calibration and validation of a simple function using real wastewater
Gustavo Vargas-Morales1, Yeney Lauzurique2, Cesar Huiliñir3
1CETAQUA, Centro Tecnológico del Agua, Santiago, Chile.
None:
Including a source of trace elements such as fly ash (FA) in the ADM1 has yet to be addressed, including calibration and validation. The present work aimed to propose, calibrate, and validate a simple function for including the FA effect in the ADM1 using real wastewater from the winery industry. The new function and the ADM1 were calibrated with data of daily methane production coming from a biochemical methane potential (BMP) test of winery wastewater without FA and validated for BMPs using five FA concentrations (25, 50, 75, 100, and 150 mg/L). The ADM1 calibration showed that the model fits well with the experimental data, although the parameter values are lower than the range reported in the literature. The calibration of the proposed function fits well with the experimental data under all conditions, including the inhibition and stimulating zones. Lastly, the modified ADM1 could accurately represent the accumulated methane at different FA concentrations, with NRMSE between 0.0635 and 0.1342. Furthermore, the sensitivity analysis shows that the proposed function only requires calibrating one parameter (ki). Thus, the proposed model is robust and valid for all the tested conditions.
More Related Videos
06:26Capturing Flow-weighted Water and Suspended Particulates from Agricultural Canals During Drainage Events
Published on: November 7, 2017
08:09Wastewater Irrigation Impacts on Soil Hydraulic Conductivity: Coupled Field Sampling and Laboratory Determination of Saturated Hydraulic Conductivity
Published on: August 19, 2018
Related Concept Videos
Fineness of Cement
Direct...
Quality of Water
Testing Water Quality
Design Example: Managing Concrete Workability