Research analytics on the applications of flexible formwork gob-side entry retention technology in medium-thickness
Xiaofan Cao1, Song Wang2, Xiaoli Wang1
1School of Architecture and Civil Engineering, Xi 'an University of Science and Technology, Xi'an, Shaanxi, China.
Abstract:
Gob-side entry retention (GER) has been successfully advanced and implemented for several years. Notably, strong economic returns have been realised for different thicknesses of coal seams under near-horizontal and gently inclined conditions. However, implementing gob-side entry retention under the conditions of high dip angle or steeply inclined coal seam has always been difficult. This paper systematically introduces the material and construction processes of flexible formwork GER. Engineering practice, theoretical calculations and indoor test analysis were used to propose an independently designed and developed special-shaped flexible formwork concrete wall with a width of 1.2 m, a strength of C30 and an inclination angle of 20°. This wall was then used to investigate the GER technology in the No. 31342 working face of the Dachiba Coal Mine. The findings reveal that the strength of the developed coal solid waste flexible formwork concrete fulfils the design requirements, and the residual strength and healing capacity are superior to that of ordinary concrete. The design of the supporting parameters of flexible formwork GER was satisfactory in the No. 31342 working face of the Daichiba Coal Mine. The overall deformation of the roadway is small, and a decent effect is obtained with respect to retaining the roadway. Hence, the technical challenge of enacting GER in medium-thick coal seams with a high dip angle under the filling and supporting modes has been resolved successfully.
Related Concept Videos
Masonry Curtain Walls
Placing Concrete
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Design Example: Managing Concrete Workability
Preplaced Aggregate Concrete
Masonry Cavity Walls
Maintaining a clean cavity during construction...
Mass Concreting
To reduce the risk of such cracking, the concrete mix may incorporate low-heat cement and pozzolans to reduce the temperature rise. Pre-cooled angular aggregates and water-reducing admixtures...