Coordination mechanism of construction industry supply chain based on data elements.
1School of Economics and Management, Beijing Jiaotong University, Beijing, P.R.China.
Plos One
|May 20, 2025
Summary
This study enhances construction supply chain coordination by integrating data into decision-making and using cost-sharing contracts. This improves collaboration, resource use, and profitability for all involved parties.
Area of Science:
- Supply Chain Management
- Construction Management
- Operations Research
Background:
- Construction supply chains often face coordination inefficiencies.
- Data integration in decision-making is crucial for optimization.
- Existing models may not fully address contractual coordination.
Purpose of the Study:
- To develop a data-driven approach for improving construction supply chain coordination.
- To design and evaluate cost-sharing and profit-sharing contracts.
- To enhance collaboration and profitability within the supply chain.
Main Methods:
- Development of a two-level supply chain model (core enterprise and suppliers).
- Analysis in a non-contractual environment to identify inefficiencies.
- Design and application of cost-sharing and profit-sharing contracts.
- Verification through case studies and numerical simulations.
Main Results:
- Non-contractual environments show significant coordination inefficiencies.
- Contractual models (cost-sharing, profit-sharing) substantially improve coordination.
- Enhanced collaboration, optimized resource allocation, and increased profitability observed.
Conclusions:
- Integrating data elements with contractual mechanisms is key to effective supply chain coordination.
- The proposed model offers a novel methodology for construction supply chain management.
- The approach leads to improved performance and stakeholder benefits.
Related Concept Videos
Machines: Problem Solving II
279
Machines are complex structures consisting of movable, pin-connected multi-force members that work together to transmit forces. Consider a lifting tong carrying a 100 kg load. It comprises movable sections DAF and CBG linked together with member AB.
279
Design Example: Alignment of a Road Line Using GIS
27
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
27
Design Example: Dimensioning of Concrete Masonry Construction
81
For the construction of a storeroom using concrete masonry units, it's essential to align the dimensions of the structure with the actual sizes of the blocks and the intended mortar joints. On the site in question, there's a stockpile of concrete masonry blocks with a nominal size of eight by eight by sixteen inches, which are to be used in the construction of the storeroom.
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
The site engineer has laid out a plan for the storeroom with external dimensions of twelve feet in length and...
81
Frames: Problem Solving II
177
Consider a hydraulic hoist supporting a load of 1 kN. Assuming a simplified schematic representation of this frame structure, the force acting on BD and BF members can be determined.
177
Manipulation and Analysis
17
GIS manipulation and analysis functions are vital for decision-making and planning. These activities range from data retrieval tasks, such as selecting information based on specific criteria, to advanced analytical techniques that address complex spatial problems.One critical GIS analysis method is overlaying, which combines multiple data layers to examine impacts. For example, overlaying a river-dammed lake boundary with road networks can identify affected infrastructure. Another common...
17
Design Example: Managing Concrete Workability
67
This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
67