Related Experiment Video
Updated: Sep 20, 2025

06:04
Experimental Investigation of the Hierarchical Control in DC Microgrids Using a Real-time Simulator
Published on: February 14, 2025
625
A Reinforcement Learning Control Framework Based on Scalable Graph Transformer for Large-Scale Fuzzy Job Shop
Summary
This study introduces a novel Graph Transformer Proximal Policy Optimization (GT-PPO) algorithm to solve the complex fuzzy job shop scheduling problem. The GT-PPO algorithm demonstrates robust performance across various scales, offering efficient solutions for large-scale scheduling challenges.
Area of Science:
- Operations Research
- Artificial Intelligence
- Computer Science
Background:
- The job shop scheduling problem (JSSP) is a computationally challenging NP-hard problem.
- Realistic JSSP variants often involve uncertainties, such as fuzzy processing times, complicating optimization.
- Existing methods struggle with the heterogeneity and long-range dependencies inherent in large-scale JSSP instances.
Purpose of the Study:
- To address the fuzzy job shop scheduling problem (JSSP) with the objective of minimizing the maximum completion time.
- To propose a novel algorithm, Proximal Policy Optimization with Graph Transformer (GT-PPO), for solving this complex scheduling variant.
- To enhance state and action representations for improved scheduling performance.
Main Methods:
- The study employs Proximal Policy Optimization (PPO) as the core reinforcement learning framework.
- A Graph Transformer (GT) architecture is utilized to capture complex relationships in fuzzy disjunctive graphs and long-range dependencies.
- Computational complexity of the GT is reduced to O(n) for efficient processing of large-scale JSSP instances.
Main Results:
- The proposed GT-PPO algorithm demonstrates strong robustness across various scales of generated and public JSSP instances after a single training session.
- Exceptional robustness was observed on large-scale DMU and Taillard public datasets.
- The algorithm effectively handles fuzzy processing times and optimizes the maximum completion time.
Conclusions:
- The GT-PPO algorithm offers an effective and efficient solution for the large-scale fuzzy job shop scheduling problem.
- The integration of Graph Transformers addresses limitations of conventional Graph Neural Networks in handling JSSP complexities.
- The model's robustness and efficiency pave the way for practical applications in complex scheduling environments.
Related Concept Videos
Sequence Networks of Rotating Machines
150
A Y-connected synchronous generator, grounded through a neutral impedance, is designed to produce balanced internal phase voltages with only positive-sequence components. The generator's sequence networks include a source voltage that is exclusively in the positive-sequence network. The sequence components of line-to-ground voltages at the generator terminals illustrate this configuration.
Zero-sequence current induces a voltage drop across the generator's neutral impedance and other...
Zero-sequence current induces a voltage drop across the generator's neutral impedance and other...
150
Transformers in Distribution System
167
Transformers in distribution systems can be broadly categorized into distribution substation transformers and other distribution transformers. They are crucial for stepping down high transmission voltages to levels suitable for distribution and end-user applications.
Distribution substation transformers come in various ratings and typically use mineral oil for insulation and cooling. To prevent moisture and air from entering the oil, some transformers use an inert gas like nitrogen to fill the...
Distribution substation transformers come in various ratings and typically use mineral oil for insulation and cooling. To prevent moisture and air from entering the oil, some transformers use an inert gas like nitrogen to fill the...
167
Reinforcement Schedules
243
Positive reinforcement is a powerful method for teaching new behaviors to both animals and humans. B.F. Skinner demonstrated this with his experiments using rats in a Skinner box. When a rat pressed a lever, it received a food pellet. This immediate reward encouraged the rat to repeat the behavior. This method, where a reward follows every instance of the behavior, is known as continuous reinforcement. It is highly effective for establishing new behaviors quickly.
Once a behavior is learned,...
Once a behavior is learned,...
243
Distributed Loads: Problem Solving
745
Beams are structural elements commonly employed in engineering applications requiring different load-carrying capacities. The first step in analyzing a beam under a distributed load is to simplify the problem by dividing the load into smaller regions, which allows one to consider each region separately and calculate the magnitude of the equivalent resultant load acting on each portion of the beam. The magnitude of the equivalent resultant load for each region can be determined by calculating...
745
Turbulent Flow: Problem Solving
194
Carbonation is a process used to dissolve carbon dioxide gas in a liquid, commonly used in the production of carbonated beverages. Achieving efficient carbonation requires careful control of temperature, pressure, and flow conditions. By adjusting these parameters, carbonation efficiency can be maximized, producing a higher concentration of CO2 in the liquid.
Temperature is a key factor in CO2 solubility. In this case, the CO2 gas and the liquid are cooled to 20°C. Lower temperatures...
Temperature is a key factor in CO2 solubility. In this case, the CO2 gas and the liquid are cooled to 20°C. Lower temperatures...
194
SFG Algebra
177
In Signal Flow Graph (SFG) algebra, the value a node represents is determined by the sum of all signals entering that node. This summed value is then transmitted through every branch leaving the node, making the SFG a powerful tool for visualizing and analyzing control systems.
Each node in an SFG corresponds to a variable, and the interactions between nodes are represented by branches with associated gains. When multiple branches lead into a node, the value at that node is the sum of the...
Each node in an SFG corresponds to a variable, and the interactions between nodes are represented by branches with associated gains. When multiple branches lead into a node, the value at that node is the sum of the...
177

