Optimal micro-grid battery scheduling within a comprehensive smart pricing scheme

Mohammed Ashraf Ali1, Ahmad H Besheer2, Hassan M Emara3

  • 1Electrical Power Engineering Department, Faculty of Engineering, Cairo University, Giza, Egypt. m.a.elgendy@hotmail.com.

Scientific Reports
|June 20, 2025
PubMed

Related Concept Videos

Batteries and Fuel Cells03:12

Batteries and Fuel Cells

A battery is a galvanic cell that is used as a source of electrical power for specific applications. Modern batteries exist in a multitude of forms to accommodate various applications, from tiny button batteries such as those that power wristwatches to the very large batteries used to supply backup energy to municipal power grids. Some batteries are designed for single-use applications and cannot be recharged (primary cells), while others are based on conveniently reversible cell reactions that...
28.0K
Maximum Power Flow and Line Loadability01:23

Maximum Power Flow and Line Loadability

The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
186
Fast Decoupled and DC Powerflow01:24

Fast Decoupled and DC Powerflow

The fast decoupled power flow method addresses contingencies in power system operations, such as generator outages or transmission line failures. This method provides quick power flow solutions, essential for real-time system adjustments. Fast decoupled power flow algorithms simplify the Jacobian matrix by neglecting certain elements, leading to two sets of decoupled equations:
303
Secondary Distribution01:25

Secondary Distribution

Secondary distribution systems provide electrical energy at the utilization voltage levels from distribution transformers to customer meters. Typical secondary voltages in the United States include 120/240 V for residential use, 208Y/120 V for residential and commercial use, and 480Y/277 V for industrial and high-rise commercial use.
In residential areas, 120/240 V single-phase, three-wire service is commonly used for lighting, outlets, and large appliances. Urban areas with high-density loads...
142
Maximum Power Transfer01:16

Maximum Power Transfer

Numerous practical applications within engineering disciplines, such as telecommunications, necessitate optimizing power delivery to a connected load. This pursuit, however, entails inherent internal losses, which can either equal or exceed the power supplied to the load. The Thevenin equivalent circuit is helpful in finding the maximum power a linear circuit can deliver to a load. It is assumed in this context that the load resistance can be adjusted.
By substituting the entire circuit with...
427
Load-frequency control01:28

Load-frequency control

Load-frequency control (LFC) is vital for maintaining power system stability, ensuring that frequency and power flows remain within acceptable limits during load changes. Turbine-governor control eliminates rotor accelerations and decelerations following load changes. However, a steady-state frequency error persists when the change in the turbine-governor reference setting is zero. In an interconnected power system, each area agrees to export or import a scheduled amount of power through...
268