Life cycle cost of communication towers: identification and hierarchical classification of influencing factors
Related Experiment Video
Updated: Sep 17, 2025

Continuous-Wave Propagation Channel-Sounding Measurement System - Testing, Verification, and Measurements
Published on: June 25, 2021
Jing Zhang1,2, Yang Wang1, Qianyi Xu3
1School of Civil Engineering, Heilongjiang University, Harbin, 150080, People's Republic of China.
Abstract:
Communication towers are essential infrastructure in modern society, require effective life cycle cost (LCC) control for long-term sustainability. While existing research has focused on structural optimization and technological advancements, few studies address cost-related issues across various stages, perspectives, and stakeholders. A multi-source factor identification approach was employed, combining literature review, field surveys, expert interviews, brainstorming, and questionnaires. An integrated Grey-SNA-ISM model was then developed. The method identified 49 factors influencing LCC, integrated Grey-SNA centrality indicators, and established four network hierarchies, which include source-driven, intermediary conduction, collaborative central control, and outcome response. A nine-layer causal hierarchy categorizes factors into fundamental, transitional, and direct influences, revealing a multi-level transmission path from institutional drivers to execution feedback. The results indicate that inadequate policy standards, insufficient management experience, and environmental constraints serve as top-level drivers. These factors flow through intermediary stages like procurement errors and design deviations, leading to downstream cost risks, such as construction delays and operational failures. This creates a dynamic, three-tier cascading structure at the strategic, organizational, and execution levels. The integrated model proposed demonstrates significant adaptability in LCC modeling for communication towers, offering methodological support for factor classification and path identification. Additionally, it shows potential for application in other complex cost systems, facilitating precise interventions and cost control throughout the life cycle.
Related Concept Videos
Transmission Line Design Considerations
Design Consideration
The factor of safety is another key...
Cable Subjected to a Distributed Load
Factorial Design
Influence of Earth's Curvature and Atmospheric Refraction on Leveling
Criteria for Causality: Bradford Hill Criteria - II

