Short- and midterm results with non-adjustable banded bypass as a revisional procedure. A case series

Anna Woestemeier1, Andreas Plamper2, Christiane Pillny1

  • 1Department for General, Visceral, Thoracic, and Vascular Surgery, University Hospital of Bonn, Venusberg-Campus 1, 53127, Bonn, Germany.

Updates in Surgery
|July 30, 2025
PubMed

Related Concept Videos

PD Controller: Design01:26

PD Controller: Design

In automotive engineering, car suspension systems often employ Proportional Derivative (PD) controllers to enhance performance. PD controllers are utilized to adjust the damping force in response to road conditions. A controller, acting as an amplifier with a constant gain, demonstrates proportional control, with output directly mirroring input.
Designing a continuous-data controller requires selecting and linking components like adders and integrators, which are fundamental in Proportional,...
Design Example: Joints in Concrete Pavements01:28

Design Example: Joints in Concrete Pavements

Concrete pavement joints are essential for maintaining the structural integrity and longevity of pavement by controlling where and how the pavement cracks. These joints can be categorized based on their functions, such as contraction or control joints, construction joints, isolation joints, and expansion joints.
Contraction joints are typically formed by sawing a groove into the concrete shortly after it has hardened. This creates a weakened vertical plane, deliberately encouraging cracking at...
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Elevation of Intermediate Points on Vertical Curves01:20

Elevation of Intermediate Points on Vertical Curves

Vertical curves are essential in roadway design because they provide smooth transitions between varying roadway grades. Designing vertical curves involves calculating intermediate elevations and identifying the curve's highest or lowest point, which is essential for optimal roadway performance.Intermediate elevations on a vertical curve are determined using the tangent offset method. This method considers the initial elevation at the start of the curve, the grades, and the curve's geometry. The...
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...