Related Experiment Video
Updated: Sep 8, 2025

04:08
Metacarpal Small Incision for Carpal Tunnel Syndrome
Published on: April 5, 2024
624
Stretcher vs Table for Operative Hand Surgery.
Loretta Coady-Fariborzian1,2, Paula Jordan2
1University of Florida, Gainesville.
Summary
Performing hand surgery on a stretcher in the operating room (OR) is safe and efficient. This new process saves valuable OR time and reduces supply costs for patient care.
Area of Science:
- Plastic Surgery
- Surgical Efficiency
- Healthcare Operations
Background:
- A Veterans Affairs Medical Center implemented a new protocol for hand surgery patients.
- Patients are now kept on the operating room (OR) stretcher instead of the OR table.
- This initiative aimed to improve OR time efficiency, reduce costs, and maintain patient safety.
Purpose of the Study:
- To evaluate the impact of performing hand surgery on a stretcher versus an OR table.
- Key metrics include OR time efficiency, cost savings, and patient/employee safety.
- The study compared two distinct 1-year periods before and after the protocol change.
Main Methods:
- Retrospective chart review of hand surgery cases performed by the same surgeon.
- Comparison of time intervals: "patient in OR" to "operation begin," "operation end" to "patient out OR," and room turnover time.
- Inquiry to Patient Safety and Employee Health offices for injury reports; analysis of supply costs for transfers.
Main Results:
- A total of 306 surgeries on the table and 191 on the stretcher were analyzed.
- Surgery on the stretcher showed a trend towards reduced time from "in-room to operation begin" (23 vs. 25 minutes) and "operation end to patient out" (3 vs. 4 minutes).
- No patient or employee injuries were reported; supply cost savings of $111.28 per case were observed with stretcher use.
Conclusions:
- Hand surgery can be safely and effectively performed on an OR stretcher.
- This practice leads to significant reductions in both operating room time and associated costs.
- Annual savings are estimated at $57,866 in supply costs and 26 hours of OR time.

