Machine learning approaches for predicting the construction time of drill-and-blast tunnels
Arsalan Mahmoodzadeh1, Hamid Reza Nejati2, Nejib Ghazouani3
1Center of Research and Strategic Studies, Lebanese French University, Erbil, Iraq.
None:
This study examines the intricate task of predicting construction duration for drill-and-blast tunnels utilizing machine learning (ML) techniques. First, a comprehensive dataset (500 data points) encompassing 20 diverse parameters was compiled by constructing eight tunnels. After meticulous analysis, 17 of the 20 parameters were identified as crucial for training the algorithms. The overbreak and tunnel cross-section parameters were found to exert a significant influence on the tunnel construction duration. To enhance the predictive accuracy of the ML models, an intensive hyperparameter tuning process was conducted. The findings underscored the effectiveness of the Gaussian process regression model in capturing complex and nonlinear relationships, achieving an average R-squared of 0.89. Additionally, an ML-based graphical user interface (GUI) was developed to facilitate real‒time estimation of tunnel construction duration. This GUI not only enables initial predictions but also allows for dynamic updates throughout the construction phase, enhancing its practical utility.
More Related Videos
04:09Predicting Treatment Response to Image-Guided Therapies Using Machine Learning: An Example for Trans-Arterial Treatment of Hepatocellular Carcinoma
Published on: October 10, 2018
07:15Machine Learning Algorithms for Early Detection of Bone Metastases in an Experimental Rat Model
Published on: August 16, 2020
Related Concept Videos
Mixing Time
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Survival Tree
Building a Survival Tree
Constructing a...
Design Example: Alignment of a Road Line Using GIS
Taping Over Different Ground Profiles
Electronic Distance Measuring Instruments