Related Experiment Video
Updated: Jan 16, 2026

Development of a More Sensitive and Specific Chromogenic Agar Medium for the Detection of Vibrio parahaemolyticus and Other Vibrio Species
Published on: November 8, 2016
Vibrio spp.: a potential critical pathogen for mammals with implications beyond marine aquaculture
Chengzhang Li1, Yiting Ji1, Xinying Li1
1Guangdong Provincial Key Laboratory of Marine Disaster Prediction and Prevention, Guangdong Provincial Key Laboratory of Marine Biotechnology, Marine Biology Institute, Shantou University, Shantou, 515063, China.
Background:
Species-specific or health status specific microbiome composition of cetaceans is still poorly classified due to the limited samples. Despite a partial identification of the gut microbiota of melon-headed whales (Peponocephala electra), comparative analyses across anatomical systems are lacking. This study provides the first comprehensive analysis of the microbial communities habiting nine body sites - oral cavity, esophagus, foregut, midgut, hindgut, blowhole, and skin wounds (left anterior, dorsal fin, tail) - in a stranded melon-headed whale.
Results:
By 16 S rRNA gene sequencing, a decrease in microbial richness was observed from the oral cavity to the hindgut, accompanied by compositional shifts from Fusobacterium-dominated oral/esophageal niches to Vibrio-enriched gastrointestinal regions (21.81% Vibrio, 21.19% Fusobacterium, 12.50% Actinobacillus). The respiratory tract microbiota underwent a significant shift and was dominated by Ostreibacterium (57.5%), Helcococcus (6.59%), and Tenacibaculum (4.12%). Skin wounds showed environmental similarities, with Vibrio (47.84%), Pseudoalteromonas (17.84%), and Psychrobacter (12.36%). Pan-microbiome screening identified seven Vibrio species (V. alginolyticus, V. cidicii, V. cyclitrophicus, V. navarrensis, V. parahaemolyticus, V. salilacus, and V. splendidus) across all niches, along with V. cholerae in non-respiratory samples. Notably, V. profundi was exclusively localized to anterior and dorsal fin wounds. Functional profiling revealed enrichment of Vibrio-linked pathogenesis pathways (infection, pathogenic cycle) and metabolic modules that were correlated with immunocompromised states.
Conclusions:
This study revealed significant bidirectional environment-host microbiome exchange dynamics across cetacean mucosal surfaces. Notably, Vibrio spp. emerged as the dominant genus in both gastrointestinal and cutaneous wound microbiomes, highlighting: (1) potential zoonotic transmission risks from pathogenic Vibrio strains, and (2) the critical need for habitat-specific microbial surveillance to inform marine mammal conservation strategies.
More Related Videos
Related Concept Videos
Microorganisms in Agriculture and Food industry
Bacterial Phylum Verrucomicrobiota
Microorganisms in Medicine and Therapeutics
Bacterial Translocation and Protein Secretion
Biofilms
Healthcare Associated Infections I: Iatrogenic, Exogenic and Endogenic
HAIs significantly increase the cost of health care. Extended stays in healthcare institutions, increased disability, increased costs of medications, including specialized antibiotics, and prolonged recovery times add to the patient's expenses and the healthcare institution and funding bodies.

