Related Experiment Video
Updated: Jan 14, 2026

Optimization, Test and Diagnostics of Miniaturized Hall Thrusters
Published on: February 16, 2019
Optimizing emergency shutdown system inspection, testing, and maintenance through the tool design and validation
Amin Babaei-Pouya1, Seyyed Bagher Mortazavi2, Omran Ahmadi1
1Department of Occupational Health and Safety Engineering, Faculty of Medical Sciences, Tarbiat Modares University, Box: 331-14115, Tehran, Iran.
Optimizing inspection, testing, and maintenance (ITM) for Emergency Shutdown (ESD) systems in petrochemicals is crucial for safety. This study developed a validated tool to assess factors influencing ITM effectiveness, enhancing asset integrity management.
Area of Science:
- Petrochemical Engineering
- Industrial Safety
- Asset Integrity Management
Background:
- Emergency Shutdown (ESD) systems are critical safety controls in the petrochemical industry.
- Effective inspection, testing, and maintenance (ITM) are vital for ESD system reliability and hazard mitigation.
- Optimizing ITM practices requires a comprehensive understanding of influencing individual and organizational factors.
Purpose of the Study:
- To optimize ITM for ESD systems in Iran's Assaluyeh petrochemical industry using an Asset Integrity Management (AIM) approach.
- To identify and validate individual and organizational factors impacting ITM effectiveness for ESD systems.
- To design and validate a specialized assessment tool for evaluating these factors.
Main Methods:
- Literature review and Fuzzy Delphi method to identify and screen influencing factors.
- Development and validation of an assessment tool focusing on planning, supervision, documentation, communication, training, safety, and technology integration.
- Statistical analysis to verify the tool's reliability and validity.
Main Results:
- Key individual and organizational factors influencing ESD system ITM effectiveness were identified and validated.
- A reliable and valid assessment tool was developed for evaluating these factors.
- The study highlights the importance of targeted interventions in planning, training, and technology adoption.
Conclusions:
- The developed assessment tool provides a robust method for evaluating current ITM practices for ESD systems.
- Implementing findings can lead to significant enhancements in ESD system reliability and overall asset integrity.
- Focusing on human and organizational elements is essential for optimizing safety and operational performance in petrochemical facilities.
Related Concept Videos
Insulation Coordination
Design Example: Automobile Ignition System
One can generate a large voltage using a car battery of 12 volts with the help of inductors. Inductors are known for opposing...
Design Consideration
The factor of safety is another key...
Control Systems
At the heart...
Mechanical Systems
Mechanical Efficiency of Real Machines
However, in reality, no machine can be truly ideal, and all of them experience some...

