Related Experiment Video
Updated: Jan 12, 2026

Photochemical Oxidative Growth of Iridium Oxide Nanoparticles on CdSe@CdS Nanorods
Published on: February 11, 2016
Synergistic Photochemistry of Dissolved Black Carbon Mediated by Iron: A Critical Pathway for Enhancing Hydroxyl
Huanxin Ma1, Yalan Chen2, Yue Wang1
1The Key Lab of Pollution Control and Ecosystem Restoration in Industry Clusters, Ministry of Education, School of Environment and Energy, South China University of Technology, Guangzhou 510006, P.R. China.
Abstract:
Dissolved black carbon (DBC) displays strong photochemical effects in surface Earth systems through reactive oxygen species production, yet the role of redox minerals during this process has been poorly characterized. While evidence emphasized significant iron-DBC coupling, the underlying mechanistic basis for their photochemical synergy requires further elucidation. This study comprehensively evaluated the coupled impacts of iron on photochemical reactive oxygen species production from a variety of DBC sources and the behind mechanisms. Results demonstrated that the synergistic photochemistry of the iron-DBC coupling system led to 1-2 orders of magnitude higher hydroxyl radical (·OH) generation than that from DBC alone, and its ·OH fluxes approached the previously reported global levels for natural ·OH yields. Notably, the Fe(III)-mediated net enhancement in ·OH generation was 2 times higher for DBC than for dissolved organic matter, yet with a minor contribution of iron redox cycling (<6%). Experimental and modeling results revealed that the photo-generation of organic peroxides (ROO·), which were initiated by the oxygenation of carbon-centered radicals produced upon photolysis of Fe(III)-DBC complexes, served as a critical pathway driving >75% of additional ·OH production. Especially, the photogenerated ROO· from DBC associated with Fe(III) showed higher reduction potentials (Ered0) beneficial for ·OH generation via intermolecular propagation reactions. Ultrahigh-resolution mass spectrometry and model compound analyses suggested the dominant roles of unsaturated carbon structures and Fe(III)-promoted decarboxylation in facilitating the significant photogeneration of ROO· from DBC. The findings explored the unrecognized photochemical pathway of iron-DBC coupling, providing new insights into the biogeochemical role of DBC and the natural origins of ·OH.
More Related Videos
10:21Developing Photosensitizer-Cobaloxime Hybrids for Solar-Driven H2 Production in Aqueous Aerobic Conditions
Published on: October 5, 2019
09:22Synthesis and Performance Evaluations of ZnCoS/ZnCdS with Twin Crystal Structure for Multifunctional Redox Photocatalysis in Energy Applications
Published on: July 25, 2025
Related Concept Videos
Radical Autoxidation
Radical Anti-Markovnikov Addition to Alkenes: Mechanism
The mechanism starts with chain initiation, which involves two steps. In the first chain initiation step, a weak peroxide bond is homolytically cleaved upon mild heating to form two alkoxy radicals. In the second initiation step, a hydrogen atom is abstracted by the alkoxy...
Radical Reactivity: Nucleophilic Radicals
Catalysis
Radical Reactivity: Overview
Radical Oxidation of Allylic and Benzylic Alcohols