Research on Mixing Uniformity Evaluation and Molding Method for Crumb Rubber Asphalt Mixtures

Wenhua Wang1,2, Yi Lu3, Lingdi Kong1,2

  • 1Shandong Expressway Infrastructure Construction Co., Ltd., Jinan 250000, China.

PubMed
Abstract

Related Concept Videos

Mixing Concrete01:30

Mixing Concrete

Concrete mixing ensures a homogenous blend where aggregates are well-coated with cement paste. Concrete mixing is typically done using two main types of mixers: batch and continuous. Batch mixers handle one batch at a time, thoroughly combining materials before discharging and receiving the next batch. In contrast, continuous mixers receive a steady flow of ingredients, mixing them consistently and discharging without interruption. Within batch mixers, tilting drum mixers mix with internal...
357
Mixing Time01:19

Mixing Time

The concept of mixing time is significant in producing a uniform concrete mix with the required strength. The mixing period starts once all components are in the mixer. Initially, the mixer is charged with 10% of the water, followed by the consistent addition of solids and then 80% of the water. The remaining water is added later, within the first quarter of the mixing period. The minimum mixing time varies according to the mixer's capacity; for example, mixers with up to 1 cubic yard...
435
Ready Mixed Concrete01:26

Ready Mixed Concrete

Ready-mixed concrete, also known as pre-mixed concrete, is prepared in a centralized plant and then transported in trucks to construction sites where it is ready for placement. This type of concrete is categorized into central-mixed, truck-mixed (or transit-mixed), and shrink-mixed. Central-mixed concrete is entirely prepared at a plant and moved to the site in agitator trucks that rotate at a speed of 2 to 6 rpm. Truck-mixed concrete, on the other hand, has the ingredients batched at the plant...
313
Slump Test01:20

Slump Test

The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate...
790