Research and engineering practice of high stage and long span complex goaf filling treatment technology
Junyu Chen1, Yang Shan1, Shuai Li2
1School of Resource and Safety Engineering, Central South University, Changsha, 410083, China.
Abstract:
The long-term mining of lead-zinc ore bodies in Suichang Gold Mine has formed a high-stage, long-span columnar goaf group above 500 m elevation, posing significant risks of roof collapse, slope fragmentation, and ground pressure disasters. These hazards threaten the safety of deep mining operations and surface stability. To address these challenges, this study integrates field investigations, laboratory rock mechanics experiments, and FLAC3D numerical simulations to analyze the stability evolution of goafs before and after filling. Key innovations include the application of disaster chain theory to interpret goaf failure mechanisms and the optimization of cement-sand ratios for targeted filling (1:20 for 260-610 m levels and 1:8 for 528-540 m levels). Results demonstrate that cemented filling reduces vertical displacement by 2-4 cm, alleviates stress concentration (maximum compressive stress decreased by 0.5-1.0 MPa), and minimizes plastic zone expansion. Furthermore, the proposed interval mining sequence (first mining 300-390 m, followed by 260-290 m and 420-500 m levels) ensures both production efficiency and operational safety. This research provides a systematic framework for goaf management in complex mining environments.
Related Concept Videos
Design Example: Maintaining Level of an Embankment
Fiber Reinforced Concrete
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
Preplaced Aggregate Concrete
Placing Concrete
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Curing of Concrete