Design parameters justification of the plough bottom's landside

Volodymyr Nadykto1, Iryna Horetska2,3, Volodymyr Kyurchev1

  • 1Department of Machine Operation and Technical Service,, Dmytro Motornyi Tavria State Agrotechnological University, 18, B. Khmelnytskyi Аve., Melitopol, 72-310, Ukraine.

Scientific Reports
|December 12, 2025
PubMed
Abstract

Related Concept Videos

Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
381
Design Example: Marking Boundaries of a Site Using a Compass01:12

Design Example: Marking Boundaries of a Site Using a Compass

Marking site boundaries using a compass is a precise surveying technique that ensures the accuracy of boundary delineation. The process begins by using provided site details, including the bearings and lengths of each boundary line. The initial step involves calculating latitudes and departures for all sides of the site. This computation verifies that the traverse is free of errors, ensuring a closed and accurate boundary.The process starts at a known point, such as Point A, which is often...
268
Design Example: Design of an Irrigation Channel01:27

Design Example: Design of an Irrigation Channel

Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
739
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
269
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
312
Masonry Paving01:21

Masonry Paving

The construction of masonry paving involves using materials such as bricks, stones, and concrete masonry units. These materials are chosen for their shape, color, strength, and resistance to abrasion and weathering. Masonry units can be installed dry on a thin layer of sand and a gravel base, or they can be embedded in mortar or asphalt on a concrete slab. For areas subjected to heavy vehicular loads, a rigid base layer of reinforced or unreinforced concrete is recommended. In contrast,...
454