Caudal Granular Insular Cortex to Somatosensory Cortex I: A Critical Pathway for the Transition of Acute to Chronic Pain
Related Experiment Video
Updated: Jan 8, 2026

Preparation of Acute Spinal Cord Slices for Whole-cell Patch-clamp Recording in Substantia Gelatinosa Neurons
Published on: January 18, 2019
Jayson B Ball1, Maggie R Finch2, Jeremy A Taylor2
1Department of Psychology and Neuroscience, Center for Neuroscience, University of Colorado Boulder, Boulder, Colorado 80309 jayson.ball@colorado.edu linda.watkins@colorado.edu.
Abstract:
Allodynia (perceiving touch as painful) is an enduring symptom of neuropathic pain. While acute pain is initiated by afferent signaling from the periphery to spinal cord, pain chronification recruits ongoing activity in supraspinal sites. One such site that has been proposed to be important in pain chronification is the caudal granular insular cortex (CGIC). The present studies of allodynia in response to sciatic nerve injury in male and female rats focus on the role of CGIC in pain chronification by analyzing: circuit-specific mGreenLantern expression to define CGIC-to-somatosensory cortex I (SI) projections; behavioral and electrophysiological effects of chemogenetic (DREADD) excitation and inhibition of CGIC; behavioral and immediate-early gene effects of pathway-specific activation and inhibition of CGIC-to-SI projections; and mGreenLantern expression in dendritic arbors of CGIC-to-SI projection neurons to assess CGIC dendritic spine changes following neuropathic pain. These studies demonstrate that signals from CGIC-to-SI are necessary for neuropathic pain. Nerve injury induces plasticity in CGIC dendritic spine morphology, multiweek chemogenetic inhibition of CGIC or CGIC-to-SI projection neurons produces an enduring reversal of neuropathic pain, and DREADD-induced excitation of this pathway in non-neuropathic rats induces allodynia and increases c-Fos expression in CGIC, SI, and pain responsive laminae in spinal cord dorsal horn. Together with recent findings showing that SI modifies incoming nociceptive and touch information, these data demonstrate that input from CGIC-to-SI input shapes SI gating of nociceptive signals and promotes the transition to chronic pain following peripheral nerve injury.
More Related Videos
Related Concept Videos
Overview of Somatic Sensory Pathways
The somatosensory system is divided into three main pathways: the dorsal (or posterior) column-medial lemniscus, spinothalamic (or anterolateral), and spinocerebellar pathways.
The dorsal...
Major Somatic Sensory Pathways
Somatosensation
Pain
Nociception
Sensory Perception: Organization of the Somatosensory System
The receptor level:
The receptor level is the first stage of sensation. It involves the detection of a stimulus by specialized sensory receptors. The stimulus must arrive within the receptor's receptive field. Next, the receptor converts the energy of the...

