Jove
Visualize
Contact Us
JoVE
x logofacebook logolinkedin logoyoutube logo
ABOUT JoVE
OverviewLeadershipBlogJoVE Help Center
AUTHORS
Publishing ProcessEditorial BoardScope & PoliciesPeer ReviewFAQSubmit
LIBRARIANS
TestimonialsSubscriptionsAccessResourcesLibrary Advisory BoardFAQ
RESEARCH
JoVE JournalMethods CollectionsJoVE Encyclopedia of ExperimentsArchive
EDUCATION
JoVE CoreJoVE BusinessJoVE Science EducationJoVE Lab ManualFaculty Resource CenterFaculty Site
Terms & Conditions of Use
Privacy Policy
Policies

Related Concept Videos

Block Diagram Reduction01:22

Block Diagram Reduction

495
The process of deriving the transfer function of a control system often involves reducing its block diagram to a single block. This simplification can be achieved through a series of strategic operations, including relocating branch points and comparators. These operations preserve the overall function of the system while allowing for easier manipulation and combination of blocks.
The first step in this process is the identification and relocation of a branch point. A branch point, where a...
495
Methods of Documentation II: POMR01:26

Methods of Documentation II: POMR

1.3K
The Problem-Oriented Medical Record (POMR) revolutionized medical record-keeping by introducing a systematic approach focusing on the patient's problems rather than merely listing symptoms. Dr. Lawrence Weed's introduction of this method in the 1960s marked a significant advancement in medical documentation. The POMR framework consists of four key components: the database, problem list, plan of care, and progress notes.
1.3K
Relation between Mathematical Equations and Block Diagrams01:20

Relation between Mathematical Equations and Block Diagrams

2.8K
In a spring-mass-damper system, the second-order differential equation describes the dynamic behavior of the system. When transformed into the Laplace domain under zero initial conditions, this equation can be effectively analyzed and manipulated. The transformation into the Laplace domain converts differential equations into algebraic equations, simplifying the process of isolating the output.
2.8K
Sequence Networks of Rotating Machines01:24

Sequence Networks of Rotating Machines

467
A Y-connected synchronous generator, grounded through a neutral impedance, is designed to produce balanced internal phase voltages with only positive-sequence components. The generator's sequence networks include a source voltage that is exclusively in the positive-sequence network. The sequence components of line-to-ground voltages at the generator terminals illustrate this configuration.
Zero-sequence current induces a voltage drop across the generator's neutral impedance and other...
467
Multimachine Stability01:25

Multimachine Stability

532
Multimachine stability analysis is crucial for understanding the dynamics and stability of power systems with multiple synchronous machines. The objective is to solve the swing equations for a network of M machines connected to an N-bus power system.
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
532
Simplified Synchronous Machine Model01:30

Simplified Synchronous Machine Model

723
The Synchronous Machine Model is a fundamental tool in analyzing and ensuring the transient stability of power systems. This model simplifies the representation of a synchronous machine under balanced three-phase positive-sequence conditions, assuming constant excitation and ignoring losses and saturation. The model is pivotal for understanding the behavior of synchronous generators connected to a power grid, particularly during transient events.
In this model, each generator is connected to a...
723

You might also read

Related Articles

Articles linked to this work by shared authors, journal, and citation graph.

Sort by
Same author

A Prototype-Guided 3D Deep Learning Framework for Myocardial Perfusion Scintigraphy Segmentation.

Journal of clinical medicine·2026
Same author

An Explainable Multi-Scale Deep Learning Framework for Multi-Class Brain MRI Classification.

Diagnostics (Basel, Switzerland)·2026
Same author

A Dual-Branch Frequency-Aware Attention Framework for Rare Neurological Disease Classification from Brain MRI.

Diagnostics (Basel, Switzerland)·2026
Same author

Integrated deep learning model for multi-label retinal disease diagnosis.

Scientific reports·2026
Same author

Advancing Arabic automated essay scoring through cross-encoder BERT models and interpretable explanations.

Scientific reports·2026
Same author

Progression-Aware and Explainable CNN-Transformer Framework for Multiclass Alzheimer's Disease Staging Using MRI.

Diagnostics (Basel, Switzerland)·2026

Related Experiment Video

Updated: Jan 8, 2026

Operation of the Collaborative Composite Manufacturing CCM System
10:09

Operation of the Collaborative Composite Manufacturing CCM System

Published on: October 1, 2019

7.0K

Automated project scheduling from UML sequence diagrams using OCR and critical path analysis

Abdulrahman Alyami1, Hisham Allahem2, Ayman Mohamed Mostafa3

  • 1Information Systems Department, College of Computer and Information Sciences, Jouf University, Sakaka, 72388, Saudi Arabia. am.yami@ju.edu.sa.

Scientific Reports
|December 18, 2025
PubMed
Summary

No abstract available in PubMed .

Keywords:
Automated project schedulingCritical path method (CPM)Dependency graphOptical character recognition (OCR)UML sequence diagrams

More Related Videos

Author Spotlight: Investigating the Role of Repetitive DNA Misregulation in Cancer Initiation and Immunotherapy Resistance
04:58

Author Spotlight: Investigating the Role of Repetitive DNA Misregulation in Cancer Initiation and Immunotherapy Resistance

Published on: December 13, 2024

3.9K
Simulation of a Scaled Assembly Process with Collaboration of a Robotic Arm and Monitoring through a Vision System for Quality Control
05:47

Simulation of a Scaled Assembly Process with Collaboration of a Robotic Arm and Monitoring through a Vision System for Quality Control

Published on: August 29, 2025

381

Related Experiment Videos

Last Updated: Jan 8, 2026

Operation of the Collaborative Composite Manufacturing CCM System
10:09

Operation of the Collaborative Composite Manufacturing CCM System

Published on: October 1, 2019

7.0K
Author Spotlight: Investigating the Role of Repetitive DNA Misregulation in Cancer Initiation and Immunotherapy Resistance
04:58

Author Spotlight: Investigating the Role of Repetitive DNA Misregulation in Cancer Initiation and Immunotherapy Resistance

Published on: December 13, 2024

3.9K
Simulation of a Scaled Assembly Process with Collaboration of a Robotic Arm and Monitoring through a Vision System for Quality Control
05:47

Simulation of a Scaled Assembly Process with Collaboration of a Robotic Arm and Monitoring through a Vision System for Quality Control

Published on: August 29, 2025

381