Correction: Sustainable management of near‑field blast‑induced ground vibration for elevating limestone extraction
Aditya Rana1, Arvind Kumar Gond2, Saikat Banerjee2
1Rock Excavation Engineering, CSIR - Central Institute of Mining and Fuel Research, Dhanbad, 826001, India. adityarana.cimfr@csir.res.in.
Environmental Geochemistry and Health
|January 4, 2026
Abstract
No abstract available in PubMed .
More Related Videos
11:14Two-way Valorization of Blast Furnace Slag: Synthesis of Precipitated Calcium Carbonate and Zeolitic Heavy Metal Adsorbent
Published on: February 21, 2017
12.8K
06:34Operation of a 25 KWth Calcium Looping Pilot-plant with High Oxygen Concentrations in the Calciner
Published on: October 25, 2017
8.3K
Related Concept Videos
Quarrying of Stone
482
Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
482
Design Example: Maintaining Level of an Embankment
378
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
378