Forecasting the Largest Expected Earthquake in Canadian Seismogenic Zones

Kanakom Thongmeesang1, Robert Shcherbakov1,2

  • 1Department of Earth Sciences, Western University, London, ON N6A 5B7, Canada.

PubMed
Summary

Earthquake forecasting in Canada using the Epidemic-Type Aftershock Sequence (ETAS) model reveals high seismic risk in British Columbia. Alberta shows the lowest risk, while Eastern Ontario and Southern Quebec face significant threats from moderate earthquakes.

Related Concept Videos

Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
342
Dynamic Modulus of Elasticity of Concrete01:16

Dynamic Modulus of Elasticity of Concrete

The dynamic modulus of elasticity assesses how a concrete structure deforms under impact or dynamic loads. It is typically higher than the static modulus of elasticity, measured under slow, steady loading conditions.
The sonic test is a common method to determine the dynamic modulus. In this test, a concrete beam, sized either 6 x 6 x 30 inches or 4 x 4 x 20 inches, is clamped at its center. Vibrations are initiated at one end of the beam by an electromagnetic exciter unit powered by a...
1.1K
Prediction Intervals01:03

Prediction Intervals

The interval estimate of any variable is known as the prediction interval. It helps decide if a point estimate is dependable.
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y. 
3.5K
Determination of Expected Frequency01:08

Determination of Expected Frequency

Suppose one wants to test independence between the two variables of a contingency table. The values in the table constitute the observed frequencies of the dataset. But how does one determine the expected frequency of the dataset? One of the important assumptions is that the two variables are independent, which means the variables do not influence each other. For independent variables, the statistical probability of any event involving both variables is calculated by multiplying the individual...
2.6K
Geoid and Ellipsoid01:28

Geoid and Ellipsoid

The Earth's shape is best described as an ellipsoid, a slightly flattened sphere created by rotating an ellipse around its minor axis. This flattening results in the polar axis being about 21 kilometers shorter than the equatorial axis. In contrast, the geoid represents the Earth's gravitational shape and aligns with the mean sea level (MSL). The geoid is an irregular equipotential surface where gravity is perpendicular at every point. Variations in Earth's mass distribution cause geoid...
838
Orders of Magnitude01:15

Orders of Magnitude

The order of magnitude of a number is the power of 10 that most closely approximates it. Thus, the order of magnitude estimates the scale (or size) of its value. To find the order of magnitude of a number, take the base-10 logarithm of the number and round it to the nearest integer. Then the order of magnitude of the number is simply the resulting power of 10.
The order of magnitude is simply a way of rounding numbers consistently to the nearest power of 10. This makes doing rough mental math...
27.7K