Assessing InSAR observability of landslides interfering with bridges
Erica Cernuto1, Diana Salciarini1, Filippo Ubertini1
1Department of Civil and Environmental Engineering, University of Perugia, Via Goffredo Duranti, 93, 06126, Perugia, Italy.
Scientific Reports
|March 2, 2026
Abstract
No abstract available in PubMed .
Keywords:
Coverage indexDeformation velocity distributionGeomorphological factorsInSARLandslide–bridge interactionMore Related Videos
Related Concept Videos
Design Example: Measuring Distance Between Two Points with Obstructions
When measuring distances in areas with physical obstructions, such as a lake in a field, surveyors must employ techniques to calculate accurate lengths without direct line measurements. One effective method is the offset technique, which allows for precise distance estimation over inaccessible stretches.In this scenario, a surveyor must measure a side of an area that crosses a lake. Since the measuring tape cannot span the lake, the surveyor begins by establishing a baseline that aligns with...
Common Leveling Mistakes and Errors
A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
Design Example: Maintaining Level of an Embankment
Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Applications of GIS: Disaster Management and Emergency Response
Geographic Information System (GIS) technology is essential for risk identification, action prioritization, and resource optimization in critical situations like flooding and earthquakes. By integrating spatial and demographic data, GIS provides a comprehensive framework for emergency response.GIS integrates data layers, like rainfall intensity, topography, elevation profiles, and river levels, to model high-risk flood zones. These layers assess areas susceptible to flooding based on their...
Design Example: Alignment of a Road Line Using GIS
The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...