Related Concept Videos

Quality Control01:05

Quality Control

Quality control is one of the three cyclical quality assurance activities that help keep a system under statistical control. Typical quality control activities include creating quality control charts, conducting proficiency testing, and documenting and archiving results.
Quality control helps track data, visualize trends, and identify variations, making it easier to detect deviations that may affect the accuracy of an analysis. One way to do this is by generating a quality control chart, which...
4.1K
Design Example: Sustainability in Concrete Building01:26

Design Example: Sustainability in Concrete Building

As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
451
Quality Assurance01:19

Quality Assurance

Quality assurance is the overarching term used to describe the activities employed to ensure the proper performance of a system. These activities can be classified into three categories: quality control, quality assessment, and internal corrective measures. Typically, these activities work cyclically: quality control is performed before and during the analysis, while quality assessment occurs during and after the investigation. Internal corrective measures are implemented based on the findings...
3.7K
Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
615