Abstract:
The reasonable delay time setting is the key factor affecting the blasting effect of gas tunnel. To this end, we have introduced a digital electronic detonator that can be freely set on site. Through theoretical analysis, we obtained the time required for the rock mass to be completely thrown out in the cutting area, revealed the law of rock mass movement by numerical simulation, and further proposed a blasting effect evaluation method and carried out engineering application. The results show that the optimal initiation time of the cutting area is 40ms, and the migration law of rock mass can be divided into three stages: crack propagation, volume increase and rock mass ejection. According to the optimal delay time in the cutting area, the optimal initiation time between each row of blast holes was determined to be 0ms, 40ms, 60ms, 80ms, 100ms, and 120ms, respectively, and a blasting effect evaluation system including blasting effect index K and circumferential flatness σ was established. Finally, a field test was carried out in a plateau gas tunnel. The statistical characteristics of the blasting effect show that after optimizing the delay time, the half-hole rate after blasting is above 90%, the linear average over-excavation is within 20 cm, and the circumferential flatness σ is 2.9 cm. The contour control accuracy is high, and the particle size distribution of the blasting pile is reasonable, which provides a reference for similar engineering blasting.
Related Concept Videos
Effects of Air-entrainment in Concrete
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Effects of Creep
Abrasion Resistance of Concrete
One such test is the revolving disc test, where three plates...
Accelerated Curing of Concrete
Accelerators
The effectiveness of calcium chloride can...