Design parameters and landing impacts of snow park jumps in Switzerland

Fabian Wolfsperger1, Benedikt Heer2, Alex Hüsler3

  • 1WSL Institute for Snow and Avalanche Research SLF, Switzerland.

JSAMS Plus
|March 25, 2026
PubMed
Abstract

Related Concept Videos

Design Example: Designing Water Slide01:18

Design Example: Designing Water Slide

When designing a water slide, controlling the speed of water flow is crucial for rider safety while maintaining an exciting experience. As water flows down the slide, gravity causes it to accelerate, with its speed at the bottom depending on the height from which it starts. The higher the slide, the more potential energy the water has at the top, which is converted into kinetic energy as it descends, increasing its speed.
Bernoulli's principle determines the water's velocity along the slide....
713
Hydraulic Jump01:29

Hydraulic Jump

A hydraulic jump is a sudden rise in fluid depth in open channels, occurring when high-velocity (supercritical) flow transitions to low-velocity (subcritical) flow. This phenomenon requires an upstream Froude number greater than 1, as flows with Fr1<1 remain subcritical, making a hydraulic jump impossible due to the need for negative head loss, which violates thermodynamic principles.The characteristics of a hydraulic jump depend on the upstream Froude number and are classified as...
830
Hydraulic Jump: Problem Solving01:16

Hydraulic Jump: Problem Solving

To analyze a hydraulic jump in a rectangular channel with a flow speed of 6 meters per second, follow these steps:Calculate Effective Upstream Velocity:When the downstream gate closes, a hydraulic jump forms, traveling upstream at 2 meters per second. This wave speed combines with the initial channel flow velocity, creating an effective upstream velocity.Identify Flow Velocities Before and After the Hydraulic Jump:Upstream of the hydraulic jump, the effective flow velocity includes both the...
701
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
513
Work Done Over an Inclined Plane01:11

Work Done Over an Inclined Plane

The center-of-mass framework helps to easily describe the work done on rigid bodies. Since the internal forces in a rigid body do no work, they can be ignored, and the external forces can be considered in the work-energy theorem.
The work done by gravity to move a rigid body, or the work done by an opposing force to move a rigid body against gravity, can be calculated using the center-of-mass framework. It is the line integral of the force of gravity over the path, considered positive if...
4.1K
Design Example: Calculating Safe Diameter for Wind-Exposed Disc01:17

Design Example: Calculating Safe Diameter for Wind-Exposed Disc

Assessing safety in wind-exposed installations is crucial to preventing potential failures. This example explores the calculation and design adjustments needed to mount a circular disc on a building facade, where wind forces are a primary concern. A 4-meter diameter disc was initially designed as an aesthetic feature facing winds at a velocity of 25 meters per second, with an air density of 1.25 kilograms per cubic meter. Given these conditions, the drag force on the disc was determined using...
380