Related Experiment Video
Updated: Mar 27, 2026

A Structured Approach to Extubation in Mechanically Ventilated Rats
Published on: July 18, 2025
Tracheostomy timing and weaning outcomes following prolonged mechanical ventilation
Alessandro Ghiani1, Konstantinos Tsitouras2, Azal Lutfi3
1Department of Pulmonology and Respiratory Medicine, RBK Lung Center Stuttgart, Robert-Bosch-Hospital GmbH of the Bosch Health Campus, Auerbachstrasse 110, Stuttgart, 70376, Germany. alessandro.ghiani@rbk.de.
Abstract:
BACKGROUND: Controversy exists on the optimal timing for performing a tracheostomy in critically ill patients, particularly in terms of clinical outcomes such as weaning failures, mechanical ventilation duration, ventilator-associated pneumonia, and mortality. The present study aimed to determine whether prolonged mechanically ventilated patients had a higher success rate in ventilator weaning after an “early” tracheostomy”, defined as ≤ 14 days following endotracheal intubation. METHODS: An observational, retrospective single-center study of 738 prolonged ventilated, tracheotomized patients treated at a national weaning center over 12 years. Propensity score matching and binary logistic regression analysis were used to evaluate whether an early tracheostomy independently predicted prolonged weaning failures, defined as the transition to home mechanical ventilation. RESULTS: The entire cohort comprised 507 early procedures (69%), and propensity score matching yielded 220 patients in each group undergoing either an early or a late tracheostomy. Prolonged weaning failure rates (34% vs. 33%, P = 0.762) and other secondary outcomes – decannulation failures, frequencies of long-term oxygen therapy at hospital discharge, mortality rates – were not different between these groups, and an early tracheostomy was not independently associated with failure to wean in logistic regression analysis. However, the groups differed significantly in the total duration of mechanical ventilation (40 days [IQR 32–56] vs. 51 days [52–70], P < 0.01), primarily due to the additional days spent on ventilators before admission to the weaning center in cases of late tracheostomy. CONCLUSIONS: No significant difference in weaning failure rates or other secondary outcomes was observed among prolonged mechanically ventilated, tracheotomized patients treated at a specialized facility, regardless of early (≤ 14 days) or late tracheostomy.
Related Concept Videos
Tracheostomy Decannulation
Description of the Procedure
Decannulation refers to the permanent removal of the tracheostomy tube, signaling the resolution of the condition that initially necessitated the tracheostomy. The process requires a well-coordinated interplay between...
Endotracheal Tube Extubation
Procedure
Extubation removes the endotracheal tube (ETT) from the patient on mechanical ventilation. It requires a well-coordinated, multidisciplinary approach involving physicians, nurses, respiratory therapists, and other healthcare professionals....
Tracheostomy: Procedure and Tubes
Tracheostomy tubes can be made of semiflexible plastic (polyurethane or silicone), rigid plastic, or metal, and they come in...
Oxygen Delivering System III: Tracheostomy and T-piece
Tracheostomy
A tracheostomy is a surgically created opening (stoma) in the anterior part of the trachea. It is used to establish a patient airway, bypass an upper airway obstruction, simplify the removal of secretions, permit long-term...
Tracheostomy Care II: Procedure
Step 1: Perform hand hygiene, and put on personal protective equipment: gown, gloves, mask...
Tracheostomy Care I: Pre-procedural Steps
Required Equipment
The equipment necessary for tracheostomy care includes:

