Abstract:
Post-installing steel bars-or anchors-using chemical agents is nowadays instrumental in repairing and strengthening existing concrete structures. In this experimental research project, beside three cast-in-place specimens provided with ordinary ribbed bars (reference specimens), eighteen specimens were designed and cast to investigate bond performance of chemically-bonded steel bars placed inside concrete blocks, subjected to a pull-out load. Specimens and reinforcement consisted in concrete cubes (side a = 250 mm) and small bars (diameter db = 10 mm). Concrete strength on cubes was 28 MPa. The parameters under investigation were: bonded length (Lb = 5/10/15 db), drilled-hole diameter (= 1.2/1.6/1.8 db), bar properties (ribbed or threaded surface in the post-installed bars) and adhesive type (Sikadur 31CF and Kimapoxy 165). Bond-slip response, bond strength and bar slip at the peak stress, failure modes, as well as bond ductility and stiffness were thoroughly investigated. As expected, in most of the chemically-bonded and cast-in-place specimens bond failure was by steel yielding within a pull out framework (no cover splitting). For the intermediate and largest hole diameters (= 1.6 and 1.8 db), the load-bearing capacity of post-installed bars was slightly larger than that of ordinary bars. In the specimens with post-installed bars, the bearing capacities with Sikadur 31CF and Kimapoxy 165 turned out to be very close for any bonded length. The bond capacity of post-installed threaded bars was from 12 to 21% less than that of post-installed ribbed bars. Compared to ordinary ribbed bars, bond ductility in post-installed bars was higher (from + 18 to + 25% for Lb = 5 db) or even much higher (from 5 to 10 times for Lb = 10 and 15 db). Finally, to evaluate bond resistance of post-installed bars, a new equation is proposed to take care of all major parameters, based on the test results of this study.
More Related Videos
10:00Experimental Protocol to Determine the Chloride Threshold Value for Corrosion in Samples Taken from Reinforced Concrete Structures
Published on: August 31, 2017
05:26Determination of the Mechanical Properties of Flexible Connectors for Use in Insulated Concrete Wall Panels
Published on: October 19, 2022
Related Concept Videos
Reinforcements in Concrete
Prestressed Concrete
Reinforced Brick Masonry
To fortify brick walls...
Design Example: Distributing Reinforcements in Concrete Sections
Fiber Reinforced Concrete
Posttensioned Masonry Walls
Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...