A reinforcement learning approach for selecting infill drilling locations considering long-term production planning
Zachary Levinson1, Roussos Dimitrakopoulos1
1COSMO Stochastic Mine Planning Laboratory, Department of Mining and Materials Engineering, McGill University, FDA Building, 3450 University Street, Montreal, Quebec H3A 0E8, Canada.
Abstract:
Simultaneous stochastic optimisation frameworks provide a method for optimising long-term production schedules in mining complexes that aim to maximise net present value and manage risk related to supply uncertainty. The uncertainty and local variability related to the quality and quantity of material in the mineral deposits are modelled with a set of stochastic orebody simulations, an input into the simultaneous stochastic optimisation framework. Infill drilling provides opportunities to collect additional information associated with the mineral deposits, which can inform future production scheduling decisions. A framework is developed for optimising infill drilling locations with a criterion that seeks areas that directly affect long-term planning decisions and requires the use of geostatistical simulations. Actor-critic reinforcement learning is applied to identify infill drilling locations in a copper mining complex using this criterion. The case study demonstrates that adapting production scheduling decisions given additional information has the potential to improve the associated production and financial forecasts and identifies a stable area for infill drilling.
Related Concept Videos
Design Example: Maintaining Level of an Embankment
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Determination of Multiple Dosing Parameters: Loading and Maintenance Doses