Study on the rational position of externally offset mining roadway in the lower split during layered mining of a

Xiaoxiang Chen1,2, Yucheng Liu3

  • 1School of Energy Science and Engineering, Henan Polytechnic University, Jiaozuo, 454003, Henan, China. chenxiaoxiang@hpu.edu.cn.

Scientific Reports
|May 5, 2026
PubMed

Related Concept Videos

Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
571
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
474
Method of Superposition01:20

Method of Superposition

The method of superposition is a crucial technique in structural engineering, used to analyze the effect of multiple loads on beams. This approach involves calculating the deflection and slope for each load on a beam separately, and then summing these effects to determine the overall impact. It is applicable only when the beam material remains within its elastic limit, ensuring that deformations are linearly elastic.
When applying the method of superposition, each type of load—whether...
2.2K
Adjusting a Traverse01:12

Adjusting a Traverse

In the site survey of a four-sided traverse, internal angles are essential to ensure geometric accuracy. The survey revealed that the sum of the measured internal angles was 359 degrees and 48 minutes, which is 12 minutes less than the expected 360 degrees. This discrepancy signals an error likely arising from measurement inaccuracies during the fieldwork.To rectify this error, the adjustment process involved distributing the 12-minute shortfall equally across the four internal angles. By...
480