Project delivery methods regulation and performance of construction projects in Uganda

Wanjusi Febiano1, Deepa Krishnan2, Nnadi Ezekiel1

  • 1Department of Civil Engineering, School of Engineering and Applied Sciences, Kampala International University, Bushenyi - Ishaka, Uganda.

Scientific Reports
|May 25, 2026
PubMed
Summary

Private construction projects in Uganda show better cost and time performance, while public projects excel in quality and safety. Project Delivery Methods significantly impact performance, with regulations enhancing effects in public projects.

Related Concept Videos

Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Preplaced Aggregate Concrete01:29

Preplaced Aggregate Concrete

Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
Methods Of Healthcare Delivery System01:26

Methods Of Healthcare Delivery System

At the different levels of the healthcare system, we see varying methods of healthcare used. These methods include managed care systems, case management, and primary healthcare.
Managed Care System:
The managed care system is designed to control the cost while maintaining the quality of care. The patient's care from admission to discharge is planned by the primary care provider or the case manager, also known as the gatekeeper. In a managed care system, the number of care providers is limited...
Placing Concrete01:17

Placing Concrete

The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Aggregate Cement Ratio01:21

Aggregate Cement Ratio

The Aggregate Cement ratio refers to the weight of aggregate divided by the weight of cement in a concrete mix. Altering this ratio has profound effects on the concrete's properties. This ratio plays a pivotal role in determining the strength, workability, and durability of concrete. When the Aggregate Cement ratio is higher, the mix is leaner, meaning it has less cement paste to lubricate the aggregate, potentially making the concrete less workable. Such mixes, known as lean, enhance the...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...