An integrated approach to mining layout design for compound-hazards mines with coordinated rockburst and water inrush

Jinzheng Bai1,2, Linming Dou3, Siyuan Gong4

  • 1Jiangsu Collaborative Innovation Center for Green Smart Cities and Heritage Conservation, Jiangsu University of Architectural Technology, Xuzhou, 221116, China. baijinzheng@cumt.edu.cn.

Scientific Reports
|May 28, 2026
PubMed

Related Concept Videos

Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Acid Mine Drainage01:19

Acid Mine Drainage

Mining activities that disturb sulfide-rich rocks, particularly those containing pyrite (FeS₂), initiate a cascade of geochemical and microbiological processes with serious environmental implications. When exposed to air and water, pyrite undergoes oxidation, releasing sulfate, ultimately forming sulfuric acid and mobilizing heavy metals into surrounding water systems. This phenomenon, known as acid mine drainage (AMD), results in low pH waters laden with toxic elements that threaten aquatic...
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Net Change Theorem01:22

Net Change Theorem

The Net Change Theorem is a fundamental principle in calculus that establishes a direct relationship between a function’s rate of change and its accumulated change over an interval. Mathematically, it states that the definite integral of a function's derivative over a given interval [a,b] yields the net change in the original function:This theorem has significant applications in various real-world scenarios, including physics, economics, and engineering. A particularly useful application is in...
Design Example: Design of an Irrigation Channel01:27

Design Example: Design of an Irrigation Channel

Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...