Related Experiment Videos
An adaptive LASSO-GARCH framework for robust EV parking occupancy forecasting and uncertainty management
Nasrin Tirgarian1, Khalil Gorgani Firouzjah2, Jamal Ghasemi1
1Department of Electrical Engineering, Faculty of Engineering and Technology, University of Mazandaran, Babolsar, Mazandaran, Iran.
Abstract:
This paper is dedicated to predicting the occupancy capacity of public parking lots for electric vehicles (EVs). The proposed method is a hybrid framework based on adaptive regression and dynamic volatility modeling. This method begins with extracting neighbors based on similarity to reduce the input dimensions. Then, the expected point load is estimated using least absolute shrinkage and selection operator (LASSO) regression. The main innovation of this method is the design of a two-stage mechanism that, in the early hours of the day due to data scarcity (cold start phase), utilizes information from similar days. Then, as the system stabilizes, the model smoothly connects to the generalized auto-regressive conditional heteroskedasticity (GARCH) algorithm to track the day's continued volatility. Additionally, a physical processing step has been subsequently added to yield correct, discrete, and non-negative outputs. The proposed framework has been validated using a comprehensive dataset based on real data from Caltech ACN-Data. Comparative analyses demonstrate the superiority of the model over benchmarks such as ARIMA and advanced deep learning architectures (LSTM and GRU) in terms of relative accuracy and stability (RMSE equal to 2.71 EVs). The analysis shows that the model has an absolute error of zero in 50% of cases. Additionally, the estimation error remains below 6 EV during 95% of working hours (while the total daily traffic of the parking is 400 EVs). Additionally, a degradation study has been presented to illustrate the necessity of synergy between the components of LASSO-GARCH. The results show that this integration has led to point accuracy. It also optimizes the uncertainty bounds by reducing the mean prediction interval width (MPIW) and maintaining a 95.5% prediction interval coverage probability (PICP).
Related Concept Videos
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
The...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Response Surface Methodology
The process of RSM involves several key steps:
One-Compartment Open Model: Wagner-Nelson and Loo Riegelman Method for ka Estimation
On...
Parametric Survival Analysis: Weibull and Exponential Methods
Weibull Distribution
The Weibull distribution is a flexible model used in parametric survival analysis. It can handle both increasing and decreasing hazard rates, depending on its shape parameter...
Uncertainty: Overview