Experimental assessment and sequential flow-deformation analysis of dewatering strategies in sheet pile-supported

Mostefa Hani1,2, Burak Evirgen2, Mustafa Tuncan2

  • 1Department of Civil Engineering and Hydraulics, Faculty of Sciences and Technology, Jijel University, 18000, Jijel, Algeria.

Scientific Reports
|June 25, 2026
PubMed

Related Concept Videos

Design Example: Creating a Hydraulic Model of a Dam Spillway01:21

Design Example: Creating a Hydraulic Model of a Dam Spillway

Scaled hydraulic models of dam spillways provide a practical way to replicate and study the intricate flow dynamics of these structures. Often built to a 1:15 ratio, these models allow for observing critical water behavior, such as velocity distribution, flow patterns, and energy dissipation.
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
Gradually Varying Flow01:29

Gradually Varying Flow

Gradually varying flow (GVF) in open channels describes situations where water depth changes slowly along the channel due to factors like non-uniform bed slope, channel shape variations, or obstructions. This flow type occurs when the depth adjusts gradually to balance gravitational forces, shear forces, and energy requirements, resulting in a low rate of depth change.Characteristics of Gradually Varying FlowGVF is commonly observed in natural streams, rivers, and canals, where flow depth...
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
To address...
Weir: Problem Solving01:26

Weir: Problem Solving

Water flow in open channels is often measured using hydraulic structures such as weirs, which allow precise calculation of discharge. In a rectangular channel, flow rates are measured using three types of weirs: rectangular sharp-crested, triangular sharp-crested, and broad-crested. The weir head is set at a fixed height above the channel bottom, simplifying calculations and enabling the relationship between depth and flow rate to be analyzed.For the rectangular sharp-crested weir, the flow...