Related Experiment Videos
From public weather narratives to solar-market risk decisions using constrained language-model features
Yuqi Zhou1, Xiangrui Meng2, Jing Qiu1
1School of Electrical and Computer Engineering, The University of Sydney, Sydney, NSW, 2006, Australia.
Abstract:
Weather risk in high-solar power systems affects generation, prices, and imbalance exposure. Public forecasting pipelines use numerical weather prediction and operator forecasts, but forecast-discussion judgment remains difficult to structure. We evaluate a constrained language-model extraction design that converts NWS Area Forecast Discussions into bounded weather-risk features. The CAISO-SP15 public-data test bed combines system-level solar generation, day-ahead and real-time price proxies, HRRR forecasts, and NWS discussions. Photovoltaic and price forecasts are propagated through 100-scenario day-block residual-bootstrap scenarios into a CVaR-regularized settlement-proxy quantity rule. In 2024-2025 full-HRRR neural forecasts, the LLM cloud-rule path produced descriptive mean all-hour PV RMSE of 1167.35 MW, compared with 1186.03 MW for no text and 1221.09 MW for keyword rules; time-based support differs by metric and comparison. For real-time prices, LLM-rule weather scores produced descriptive mean RMSE of 17.94 USD/MWh, compared with 18.47 USD/MWh for rule-text scores. In ex-post public-data proxy accounting with a common rule-core anchor and matched [Formula: see text] blend, the LLM scenario path increased proxy value by 45.24 million USD, reduced [Formula: see text] loss by 5.84 thousand USD per hour, and reduced imbalance by 852.7 GWh. These results support public weather narratives as an auditable residual-information layer for solar forecasting and settlement-proxy risk evaluation.
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
What is Weather?
Global Climate Change
What is Climate?
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
The...
Hindsight Biases