Multi-effects of tunneling and excavation on pile group in clay
Hongguo Diao1,2, Zhiwei Zhou1, Qiang Li3
1School of Engineering, Hangzhou City University, Hangzhou, 310015, China.
Abstract:
Existing studies predominantly investigate the impacts of tunnel or excavation on pile foundations in isolation, whereas actual engineering projects often involve sequential or simultaneous excavation of tunnels and excavation. This study focuses on the effects of combined tunnel and excavation unloading on adjacent pile groups in clay strata. Constant-gravity physical scaled model tests and three-dimensional numerical simulations are conducted, accounting for the time-dependent effects of clay excavation unloading and soil stiffness characteristics under small-strain conditions. The additional responses of pile foundations and the evolution of excess pore water pressure dissipation during excavation unloading are systematically analyzed. The results reveal that the type of pile foundation surrounding tunnels and foundation pits has a minor influence on surface settlement. Both tunnel and excavation induce tilting of pile groups toward the unloading zone: the tilt increases continuously to 0.12% of the pile spacing during tunnel excavation, gradually decreases to 0.05% of the pile spacing during excavation, and a net tilt toward the tunnel side persists in the end. Pile foundation type affects the axial force variation pattern of piles. Owing to the shielding effect of rear piles in the group, the maximum negative bending moment of the pile group is approximately 29% smaller than that of a single pile, with a large bending moment occurring near the pile head. The presence of excavation support structures and existing pile foundations alters seepage paths of pore water, thereby influencing the dissipation time of excess pore water pressure.
Related Concept Videos
Impact Strength of Concrete
Preplaced Aggregate Concrete
Effects of Creep
Placing Concrete
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the block.
Expansion and Contraction in Masonry Walls
To...