Assessing the impact of construction material waste drivers on project cost overrun across material processing
Lobna Kamal1, Mohamed S Yamany2, Hossam E Hosny1
1Department of Construction Engineering, Faculty of Engineering, Zagazig University, Zagazig, 44519, Egypt.
Abstract:
A considerable quantity of materials supplied to construction sites becomes waste, hence escalating project costs. Nevertheless, research lacks a thorough assessment of the intricate, indirect, and non-linear correlation between material waste drivers at different processing stages and project cost overruns. This research study investigates this correlation using an advanced multivariate statistical technique known as structural equation modeling (SEM). Data were collected through a questionnaire survey to evaluate the construction material waste factors (CMWFs) and their association with cost overruns in construction projects in Egypt. An exploratory factor analysis was conducted to categorize CMWFs into material processing phases: (1) design and documentation, (2) material procurement, (3) material handling, storage, and transportation, and (4) on-site management. An SEM model was developed to uncover the impact of latent material processing phases on project cost overruns. The model's consistency, reliability, and accuracy were verified employing various performance metrics, including Cronbach's Alpha, composite reliability, and root mean squared error. The results demonstrate that factors related to material handling, storage, and transportation exhibit the highest correlation and impact on project cost overruns, as reflected by an R2 value of 0.441 and a p-value below 0.05. This research helps decision-makers prioritize mitigation strategies for material waste and cost overruns, hence enhancing construction project performance.
Related Concept Videos
Impact Loading
In cases of elastic deformation,...
Design Example: Managing Concrete Workability
To address...
Design Consideration
The factor of safety is another key aspect...
Bending of Members Made of Several Materials
Hooke's Law determines stress in each material, stating that stress is proportional to strain but varies due to each material's...
Strategies for Assessing and Addressing Confounding
Confounding can be addressed at both the design phase of a study and through analytical methods after data...
Method of Superposition
When applying the method of superposition, each type of load—whether...